Laserfiche WebLink
60 City of Sunny Isles Beach New Facility Qualifications for Architectural Design Services <br /> <br />Eric Search, P.E. <br /> Page 2 of 2 <br /> <br /> <br /> <br /> U.S. Army Garrison (USAG) Fort Buchanan, Antilles Elementary <br />School, Bayamon, PRI. Structural engineering and construction support <br />services for a 155,000-square-foot, two-story elementary school building. <br />The building was designed to withstand small and large missile impacts <br />from debris caused by hurricane force winds. The project scope included <br />design of foundations and lateral systems. <br /> Sandhill Water Reclamation Facility, Kissimmee, FL.* Structural design <br />of an expansion of an advanced secondary facility that can process three <br />million gallons per day. The $17 million project, completed in 2005, <br />included design for an operations building, a blower equipment building, a <br />hypochlorite storage structure, and electrical building, basins for <br />preliminary treatment, aeration process, and UV treatment, an effluent <br />pump station and a filter tank. <br /> Palm Beach State College, Burn Building, Lake Worth, FL. Structural <br />design of a three-story, 4,200-square-foot building on the Lake Worth <br />campus. <br /> Florida Atlantic University, Culture and Society Building, Boca Raton, <br />FL.* Structural design of a 73,000-square-foot facility on the university’s <br />main campus. The three-story structure consists of tilt-up concrete wall <br />construction with an internal steel frame. The $19 million building, <br />completed in 2010, features a full-height glass atrium and includes <br />classrooms, administrative offices, four 40-seat living room theaters and a <br />café. <br /> Palm Beach State College, Technical Education Center, Belle Glade, <br />FL.* Structural design of a 34,000-square-foot concrete-framed structure <br />that incorporates the PSI System with precast joists and soffit beams. The <br />two-level building features a three-story-tall glass atrium, which encloses <br />the entrance, lounge and café areas. The $13 million facility, completed in <br />2010, houses classrooms and workshop space for education in the <br />construction and machine trades. <br /> Boca Raton Resort and Club, Boca Beach Club Expansion, Boca <br />Raton, FL.* Structural design to renovate and replace the façade of a <br />seven-story, 300,000-square-foot hotel and add a new 200,000-square- <br />foot expansion. The project transformed the 1970s beachfront property <br />into a world-class resort complex. The new construction also includes a <br />750-space, four-story post-tensioned concrete garage topped by a rooftop <br />plaza that serves as the resort’s main entrance. <br /> Boca Bridge Hotel, Boca Raton, FL. Structural engineering and special <br />inspection services for the renovation of an 11-story hotel and expansions <br />to the lobby and restaurant area. Project included the addition of a <br />vehicular concrete ramp and openings in the existing shear walls. <br /> Westfield Sarasota Square, Sarasota, FL.* Structural design to renovate <br />and add a 75,000-square-foot expansion to existing retail mall. Completed <br />in 2008, the project included a total interior renovation and accommodates <br />three new restaurants, a new food court and new entrances. <br />*Denotes work performed with previous employer.