My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2402
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 3:07:43 PM
Creation date
6/2/2015 3:07:31 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2402
Date (mm/dd/yyyy)
04/16/2015
Description
3rd Amd to Agmt w/Keith & Schnars FPL Overhead to Underground Conversion Proj
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Survey (S.15) <br /> 1. Right-of-way Survey $14,900 <br /> 2. Additional Sketch & Descriptions (assumes 50 units) $17,500 <br /> 3. Additional Easement Surveys (assumes 50 units) $20,000 <br /> 4. Test Hole locations(assumes 25 units) $1,250 <br /> Subtotal Survey= $53,560 <br /> Engineering (E.31) <br /> 5. Input Existing Utilities $13,500 <br /> 6. Utility Test Holes(assumes 25 units) $6,875 <br /> 7. Incorporate FPL Design $16,200 <br /> 8. Coordinate LV Utilities $7,400 <br /> 9. Prepare Underground Plans for Construction $11,000 <br /> Subtotal Engineering = $54,975 <br /> Total Task = $108,535 <br /> Task 2: BIDDING SERVICES: <br /> Bidding includes preparation of bid documents including CONSULTANT plans for conduits and structures, <br /> FP&L design, Specifications, preparation of bid forms, pre-bid meeting, responding to questions from <br /> bidders, and assisting in bid assessment and award. Prior to letting the project for bids, the project must be <br /> modified to reflect private undergrounding efforts along Collins Avenue. In addition, permit needs of <br /> individual utilities and required phasing must be identified to organize activities within the Collins Avenue <br /> right-of-way. <br /> E.27 Pre-bid Adjustments: <br /> Using information provided by CITY, CONSULTANT will revise construction documents to <br /> coordinate with undergrounding efforts provided through private development. Unless directed <br /> otherwise, CONSULTANT shall assume the project as currently identified to be complete. CITY <br /> shall have the responsibility in making the determination for properties to be excluded and provide <br /> necessary information for incorporation into CONSULTANT's plans. <br /> In addition, CONSULTANT shall solicit utilities to determine phasing of work and related permits. <br /> Professional Services Agreement <br /> Project Name: Utility Undergrounding Consulting—Phase III <br /> Project Location:Sunny Isles Beach,FL <br /> K&S Project 18073—Amendment No.4 <br /> January 27,2015 Revised March 31, 2015 Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.