My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2402
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 3:07:43 PM
Creation date
6/2/2015 3:07:31 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2402
Date (mm/dd/yyyy)
04/16/2015
Description
3rd Amd to Agmt w/Keith & Schnars FPL Overhead to Underground Conversion Proj
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 . SCOPE OF SERVICES <br /> CONSULTANT's services are divided into three categories; Expanded Project Limits, Bidding Services, and <br /> Assessment Roll. Expanded Project Limits includes right-o-way survey, utility research, coordination with <br /> LV utilities, and additional easements. Bidding Services includes preparation of bid documents and <br /> solicitation of bids. In addition to and coinciding with construction, a special assessment will be issued on <br /> properties which benefit from proposed improvements. The City will use an outside consultant to determine <br /> the assessment methodology to be used in preparing the assessment roll. CONSULTANT shall assist <br /> assessment efforts by providing information and cost estimates based upon approved plans. <br /> To avoid disruption to the FDOT's RRR project, the transfer of utilities from overhead to underground will <br /> commence following the completion of FDOT's improvements. The improvements constructed in reference <br /> to this work authorization include the underground infrastructure of conduits, manholes, and equipment <br /> pads necessary for conversion. Upon completion of the underground infrastructure, the right-of-way will be <br /> turned over to FDOT's contractor to deliver the RRR project. Following the RRR project, the transfer of <br /> overhead utilities to underground will commence. Construction Phase Services are not included; they shall <br /> be addressed under separate Work Authorization. <br /> Tasks for subsequent phases will be defined under separate work authorizations. Services for this work <br /> authorization are as follows: <br /> Task 1: EXPANDED PROJECT LIMITS (Base Project): <br /> With the inclusion of off-Collins improvements, the project has been expanded to include.Atlantic Boulevard <br /> between 175th and 178th and Atlantic Boulevard between 185th and 191st. With the expanded areas, utility <br /> coordination, identification of easements, and incorporation of proposed LV designs will be necessary. In <br /> addition, right-of-way survey will be required for the expanded areas. <br /> Survey Services: <br /> Subtask S.11 - Right-of-Way Survey, Atlantic Boulevard: <br /> CONSULTANT shall perform Topographic Design Surveys of the following Locations: <br /> • Atlantic Boulevard from 175th Terrace to 178th Street. (Includes 150 feet of 175th Terrace <br /> east from the intersection with Atlantic Boulevard.) (Total is approximately 1250 feet.) <br /> • 178th Street from southbound Collins Avenue west approximately 600 feet <br /> • Atlantic Boulevard from 185th Street to NE 191st Street. (Includes 300 feet of 185th Street <br /> and 186th Street.) (Total is approximately 2300 feet.) <br /> • 191st Street from southbound Collins Avenue West 250 feet <br /> Professional Services Agreement <br /> Project Name: Utility Undergrounding Consulting—Phase III <br /> Project Location:Sunny Isles Beach,FL <br /> K&S Project 18073—Amendment No.4 <br /> January 27,2015 Revised March 31, 2015 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.