My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BEA Architects, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-04-01) Architectural Design Services for a New Facility at 18080 Collins Ave.
>
Responses
>
BEA Architects, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2015 11:18:58 AM
Creation date
6/5/2015 11:12:14 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Architectural Design Svcs for 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
51 | <br />BEAarchitects <br />Ransom Everglades School Aquatic CenterCoconut Grove, FL <br />firm’s responsibilities <br />Prime Architect <br />Value Engineering <br />Consulting <br />Coordination <br />Change Order/Schedule Review <br />Construction Observation <br />key personnel <br />Bruno Ramos, AIA, GC, <br />NCARB, LEED AP <br />John Colao, AIA, GC <br />Sonia Mak, RA <br />completion date <br />2012 <br />owner’s name & address <br />Ransom Evergaldes School <br />3575 Main Highway <br />Coconut Grove, FL 33133 <br />Mr. Andres De Angulo <br />305.460.8832 <br />ADEAngulo@RansomEverglades.org <br />BEA provided complete A/E services for this aquatic center in a sensitive and historical <br />environment. The building provides an above ground competition size pool, a training pool, <br />gymnasium, offices, ancillary facilities and parking areas. The surrounding landscape design <br />includes a seating plaza dedicated to the students and two new tennis courts. A beautified <br />walkway links the new sports facilities to the existing gymnasium and football field to unify the <br />school’s sports complex. BEA conducted a program and budget verification, zoning and code <br />analysis and design concept for the new facility. Our responsibilities included providing full <br />construction documents, bid package, and construction administration.
The URL can be used to link to this page
Your browser does not support the video tag.