My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sol-ARCH
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-04-01) Architectural Design Services for a New Facility at 18080 Collins Ave.
>
Responses
>
Sol-ARCH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2015 11:45:43 AM
Creation date
6/5/2015 11:44:00 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Architectural Design Svcs for 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br />QUALIFICATIONS FOR THIS CONTRACT NUMBER <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F far each project. 8 <br />21. TITLE AND LOCATION icily and State) 22. YEAR COMPLETED <br />Tamiami Airport Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Hangars 1 and 2 1 2012 <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />Miami Dade County Jorge Marin 305- 876 -7565 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT finclude scope, size, and cost) <br />Sol -ARCH was commissioned to be the project architects for two new metal hangars, 12,000 <br />sf. Approximate cost of construction was $1,700,000. Scope: design two metal hangars for <br />fuel loaded planes in conjunction with adjacent office space. The design will include close <br />monitoring of the Kendall Tamiami Airport storm water management plan and all the NFPA <br />required fire suppression systems. In addition, Sol -ARCH will produce construction <br />documents and provide construction management. (Project is ongoing) <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 (8/2004) PAGE 3 <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />a. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />b. <br />0) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />C. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />d. <br />(1) FIRM NAME <br />(2) FIRM LOCATION icily and State) <br />(3) ROLE <br />e. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />f. <br />STANDARD FORM 330 (8/2004) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.