Laserfiche WebLink
1 TEAM'S <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />COMDlete one Section F for each oroiect.l <br />21. TITLE At <br />Staples <br />Miami, FL <br />23. PROJECT OWNER'S INFORMATION <br />NUMBER <br />22. YEAR COMPLETED <br />E <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />Staples Bill Biondi 305- 284 -2211 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT flnclude scope, size, and cost) <br />Sol -ARCH was commissioned to design and perform construction management for the Staples <br />retail store that was approx. 20,300 sf located at 2121 Biscayne Blvd in Miami. During the <br />planning and design phase we worked closely with the City of Miami and Mayor, Manny Diaz, <br />as the project would serve as the benchmark for the future city of Miami projects which now <br />require U.S.G.B.C. certification. Our project received a U.S.G.B.C. rating of "Gold ". The <br />approximate cost of construction was $2,000,000.00 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 (612004) PAGE 3 <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />a. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />b. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />C. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />d. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />e. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />f. <br />STANDARD FORM 330 (612004) PAGE 3 <br />