My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sol-ARCH
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-04-01) Architectural Design Services for a New Facility at 18080 Collins Ave.
>
Responses
>
Sol-ARCH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2015 11:45:43 AM
Creation date
6/5/2015 11:44:00 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Architectural Design Svcs for 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT <br />QUALIFICATIONS FOR THIS CONTRACT NUMBER <br />(Present as many projects as requested by the agency, or 10 pro jects, if not specified. <br />Complete one Section F for eac 1 10 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />MIA Edge Beam Miami, FL PROFESSIONAL SERVICES CONSTRUCTION( /fapp /icabte) <br />2008 <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />Miami Dade County Jorge Marin 305- 876 -7565 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />The scope of work for the edge beam repair at terminal F, G and H entailed repairing all <br />areas of water leaking between terminal building and driveway. Spalled areas of concrete <br />have rusted through to the reinforcement. Prior to work being done, the existing <br />soffit had to be removed and inspected for damages. The challenge here was how soffits were <br />removed, stored, preserved, reinstalled, and ultimately performing the concrete restoration <br />work without interrupting terminal use. Size was 1000 lineal ft, and the approximate cost <br />was $450,000. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 (6/2004) PAGE 3 <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />a. <br />(1) FIRM NAME <br />(2) FIRM LOCATION /City and State) <br />(3) ROLE <br />b. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />C. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />d. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />e. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />f. <br />STANDARD FORM 330 (6/2004) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.