Laserfiche WebLink
55 <br />Public Services Facility On Five-Acre Site <br />In designing a new multi-departmental public services complex for the City of Sunrise, a <br />primary challenge was to allow each department’s connectivity to the whole while enabling <br />them to operate separately. Their differing hours of operation and varying levels of security <br />were carefully considered in the site plan to balance strategic accessibility with maximum <br />protection. The buildings include: Public Works (16,440 SF), Leisure Services (8,356), Fleet <br />Maintenance (18,648 SF), Fueling Station (4,728 SF), and Trash Transfer Station (5,508 SF). <br />Each department’s functional, equipment, and material storage needs were thoroughly <br />assessed. A tilt-up wall system was utilized for cost- and time-effectiveness. Our firm <br />monitors onsite construction progress, ensuring quality control throughout. The 51,000 <br />SF project was budgeted at $7.5 million. The Fueling Station was completed in the last <br />quarter of 2009. The remainder of the project has just been completed at the end of 2013. <br />Client City of Sunrise <br />Services Programming <br />Master Planning <br />Architectural Design <br />Contract Administration <br />Status Phase I completed in 2009 <br />Phase II completed in 2013 <br />Success An aesthetically appealing public <br />service campus that is conducive <br />to productivity and teamwork. <br />Govern