|
ARCHITECTURE
<br />ENGINEERING
<br />PLANNING
<br />INTERIOR DESIGN
<br />CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01
<br />NEW FACILITY AT 18080 COLLINS AVE.36
<br />JAVIER LLAVONA, P.E.
<br />Electrical Engineering
<br />Education
<br />Bachelor of Science Civil Engineering
<br />Florida International University
<br />1997
<br />Registration
<br />Florida No. 58684
<br />
<br />RELEVANT PROJECT EXPERIENCE
<br />Flamingo Park Master Plan and Tennis Center, Miami
<br />Beach, FL New master plan for the 36-acre park and a
<br />new 5,000 SF tennis center for the historic park. The new
<br />tennis center will have 17 hydro grid courts, a new re-
<br />stroom building, new handball courts, new tot lot, a new
<br />water feature at the center of the park, and new lighting,
<br />fencing, landscaping and shade trees along pedestrian
<br />promenades.
<br />City of Miami Virrick Park Pool, Miami, FL Scope in-
<br />cludes demolition and construction of a new pool building
<br />facility within the existing footprint. Building includes ad-
<br />ministration, bath house, concession stand, smaller pool
<br />and a splash playground.
<br />City of Miami Parks and Recreation, Miami, FL WA per -
<br />formed improvements and upgrades to 17 parks through-
<br />out the City. The scope of work included site adaptation,
<br />master planning, and other site related services for ath-
<br />letic facilities and park design of football, soccer, baseball
<br />and softball fields, sports lighting, including bleachers,
<br />dug-outs, batting cages, sport lighting and field events
<br />such as high jump and pole vault etc.
<br />Camillus House Center, Miami, FL The new 215,000
<br />SF Camillus House Center sits on a 3.1 acre site with
<br />a campus style environment. The complex includes 340
<br />beds, and the most complete range of social and clinical
<br />services available in South Florida to serve an estimat-
<br />ed 4,300 people a year. The buildings are equipped with
<br />state-of-the-art biometric security systems and include
<br />administrative offices, meeting and instructional rooms
<br />for the assessment of clients. The project includes a sev-
<br />en level 280 car parking garage and has received LEED
<br />Gold certification.
<br />South Miami Heights Maintenance Facility, South
<br />Miami, FL A/E design services for the development of a
<br />new Miami-Dade Water and Sewer Department Mainte-
<br />nance. The facility to be built on a 17.5 acre site consists
<br />of approximately 126,000 SF of new construction encom-
<br />passing administration offices, maintenance shops, ware-
<br />house and storage areas and a maintenance garage.
<br />Doral Public Works Facility, Doral, FL Project architect
<br />for a new vehicle maintenance and public works facili-
<br />ty housing approximately 30,000 SF including a vehicle
<br />service bays, wash and fueling facility to accommodate
<br />6 trolleys and approx. 120 vehicles. The project received
<br />LEED Gold Certification.
<br />Braman Automotive Parking Garage and Showroom,
<br />Miami, FL New seven-level, 500,000 SF parking garage
<br />for 1,600 cars. Showrooms are located on the ground
<br />floor and partial second floor with a combined area of ap-
<br />proximately 90,000 SF. An interior, monumental stair is
<br />strategically located to entice and facilitate access to the
<br />second floor showroom. Project was approved for Miami
<br />21.
<br />The Palms Hotel Parking Garage, Miami Beach, FL
<br />New parking garage with five-levels and 300 vehicle
<br />spaces. Due to proximity to the ocean special consider-
<br />ation was given when choosing the materials.
<br />Publix 84 and Parking Garage, Coral Gables, FL A new
<br />58,000 SF Publix Super Market with five-levels of inte-
<br />grated parking for 809 vehicles.
|