Laserfiche WebLink
ARCHITECTURE <br />ENGINEERING <br />PLANNING <br />INTERIOR DESIGN <br />CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 <br />NEW FACILITY AT 18080 COLLINS AVE.35 <br />CESAR HERRAN, P.E. LEED AP <br />Director of Engineering <br />Education <br />Bachelor of Science Mechanical <br />Engineering University of Havana (ISPJAE) <br />1989 <br />Registration <br />FL-No. 71524 <br />MUNICIPAL PROJECT EXPERIENCE <br />Flamingo Park Master Plan and Tennis Center, Miami <br />Beach, FL New master plan for the 36-acre park and a <br />new 5,000 SF tennis center for the historic park. The new <br />tennis center will have 17 hydro grid courts, a new re- <br />stroom building, new handball courts, new tot lot, a new <br />water feature at the center of the park, and new lighting, <br />fencing, landscaping and shade trees along pedestrian <br />promenades. <br />City of Miami Virrick Park Pool, Miami, FL Scope in- <br />cludes demolition and construction of a new pool building <br />facility within the existing footprint. Building includes ad- <br />ministration, bath house, concession stand, smaller pool <br />and a splash playground. <br />City of Miami Parks and Recreation, Miami, FL WA per - <br />formed improvements and upgrades to 17 parks through- <br />out the City. The scope of work included site adaptation, <br />master planning, and other site related services for ath- <br />letic facilities and park design of football, soccer, baseball <br />and softball fields, sports lighting, including bleachers, <br />dug-outs, batting cages, sport lighting and field events <br />such as high jump and pole vault etc. <br />South Miami Heights Maintenance Facility, South <br />Miami, FL A/E design services for the development of a <br />new Miami-Dade Water and Sewer Department Mainte- <br />nance. The facility to be built on a 17.5 acre site consists <br />of approximately 126,000 SF of new construction encom- <br />passing administration offices, maintenance shops, ware- <br />house and storage areas and a maintenance garage. <br />City of Doral Public Works Facility, Doral, FL New ve- <br />hicle maintenance and public works facility for the City <br />of Doral. The two story facility is approximately 31,527 <br />SF including a vehicle wash and fueling facility to accom- <br />modate six municipal trolleys and approximately 120 city <br />owned vehicles. Administrative offices includes about <br />12,286 SF of offices, storage, break rooms, distribution <br />center, and other support areas. The vehicle maintenance <br />wing has garage services bays for trolleys, city owned ve- <br />hicles, and a bay for tire storage and repair. <br />City of Miami Beach Property Management Facility, <br />Miami Beach, FL New property management facility to <br />included administrative offices, workshops, inventory <br />warehouse, oversized vehicle parking, hazardous mate- <br />rial storage, loading area and an emergency generator. <br />Roberto Clemente Park Community Center, Miami, <br />FL HVAC feasibility study for an existing building. Project <br />included HVAC design development documents and <br />100% construction and Leed documents. Thermal load <br />calculations, state energy calculations, static pressure <br />and ventilation calculations, equipment selection, air <br />distribution layout and detailing for a 12,000 to 8,000 SF <br />new single story building was provided. All Leed documents <br />have been uploading as required to achieve Gold Building <br />Construction Certification. <br />Florida International University, Baseball Stadium, <br />Press Boxes, Miami, FL New press box, press/work <br />room and offices, splits units and condensing units DX <br />with capacity of 5TN & 7.5TN to serve the 2,100sf area. <br />The space also includes a small telecommunication room <br />with a ductless split unit of 1.5 tons. <br />Florida International University, Chiller Plant Opera- <br />tion, North Campus, Miami, FL Mechanical Engineer for <br />the change of sequence of operations on the chiller plant <br />to include the addition of pumps on primary and second- <br />ary loops monitored by BMS. <br />U.S. Department of Justice Building Renovations, <br />Miami, FL Mechanical Engineer for the HVAC and fire <br />protection design and construction documents for a 7,500 <br />sf renovation of office space on the 2nd floor. <br />University of Miami, Pavia Street Parking Garage <br />Expansion, Coral Gables, FL Mechanical Engineer for <br />the design, calculations and construction documents for <br />the Fire Protection project of 180,000 sf parking garage.