|
ARCHITECTURE
<br />ENGINEERING
<br />PLANNING
<br />INTERIOR DESIGN
<br />CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01
<br />NEW FACILITY AT 18080 COLLINS AVE.35
<br />CESAR HERRAN, P.E. LEED AP
<br />Director of Engineering
<br />Education
<br />Bachelor of Science Mechanical
<br />Engineering University of Havana (ISPJAE)
<br />1989
<br />Registration
<br />FL-No. 71524
<br />MUNICIPAL PROJECT EXPERIENCE
<br />Flamingo Park Master Plan and Tennis Center, Miami
<br />Beach, FL New master plan for the 36-acre park and a
<br />new 5,000 SF tennis center for the historic park. The new
<br />tennis center will have 17 hydro grid courts, a new re-
<br />stroom building, new handball courts, new tot lot, a new
<br />water feature at the center of the park, and new lighting,
<br />fencing, landscaping and shade trees along pedestrian
<br />promenades.
<br />City of Miami Virrick Park Pool, Miami, FL Scope in-
<br />cludes demolition and construction of a new pool building
<br />facility within the existing footprint. Building includes ad-
<br />ministration, bath house, concession stand, smaller pool
<br />and a splash playground.
<br />City of Miami Parks and Recreation, Miami, FL WA per -
<br />formed improvements and upgrades to 17 parks through-
<br />out the City. The scope of work included site adaptation,
<br />master planning, and other site related services for ath-
<br />letic facilities and park design of football, soccer, baseball
<br />and softball fields, sports lighting, including bleachers,
<br />dug-outs, batting cages, sport lighting and field events
<br />such as high jump and pole vault etc.
<br />South Miami Heights Maintenance Facility, South
<br />Miami, FL A/E design services for the development of a
<br />new Miami-Dade Water and Sewer Department Mainte-
<br />nance. The facility to be built on a 17.5 acre site consists
<br />of approximately 126,000 SF of new construction encom-
<br />passing administration offices, maintenance shops, ware-
<br />house and storage areas and a maintenance garage.
<br />City of Doral Public Works Facility, Doral, FL New ve-
<br />hicle maintenance and public works facility for the City
<br />of Doral. The two story facility is approximately 31,527
<br />SF including a vehicle wash and fueling facility to accom-
<br />modate six municipal trolleys and approximately 120 city
<br />owned vehicles. Administrative offices includes about
<br />12,286 SF of offices, storage, break rooms, distribution
<br />center, and other support areas. The vehicle maintenance
<br />wing has garage services bays for trolleys, city owned ve-
<br />hicles, and a bay for tire storage and repair.
<br />City of Miami Beach Property Management Facility,
<br />Miami Beach, FL New property management facility to
<br />included administrative offices, workshops, inventory
<br />warehouse, oversized vehicle parking, hazardous mate-
<br />rial storage, loading area and an emergency generator.
<br />Roberto Clemente Park Community Center, Miami,
<br />FL HVAC feasibility study for an existing building. Project
<br />included HVAC design development documents and
<br />100% construction and Leed documents. Thermal load
<br />calculations, state energy calculations, static pressure
<br />and ventilation calculations, equipment selection, air
<br />distribution layout and detailing for a 12,000 to 8,000 SF
<br />new single story building was provided. All Leed documents
<br />have been uploading as required to achieve Gold Building
<br />Construction Certification.
<br />Florida International University, Baseball Stadium,
<br />Press Boxes, Miami, FL New press box, press/work
<br />room and offices, splits units and condensing units DX
<br />with capacity of 5TN & 7.5TN to serve the 2,100sf area.
<br />The space also includes a small telecommunication room
<br />with a ductless split unit of 1.5 tons.
<br />Florida International University, Chiller Plant Opera-
<br />tion, North Campus, Miami, FL Mechanical Engineer for
<br />the change of sequence of operations on the chiller plant
<br />to include the addition of pumps on primary and second-
<br />ary loops monitored by BMS.
<br />U.S. Department of Justice Building Renovations,
<br />Miami, FL Mechanical Engineer for the HVAC and fire
<br />protection design and construction documents for a 7,500
<br />sf renovation of office space on the 2nd floor.
<br />University of Miami, Pavia Street Parking Garage
<br />Expansion, Coral Gables, FL Mechanical Engineer for
<br />the design, calculations and construction documents for
<br />the Fire Protection project of 180,000 sf parking garage.
|