Laserfiche WebLink
ARCHITECTURE <br />ENGINEERING <br />PLANNING <br />INTERIOR DESIGN <br />CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 <br />NEW FACILITY AT 18080 COLLINS AVE.50 <br />CITY OF DORAL PUBLIC <br />WORKS FACILITY <br />Doral, FL <br />Client <br />City of Doral <br />Rudy de la Torre,Chief of Construction <br />305-593-6725, <br />rudy.delatorre@cityofdoral.com <br />Services <br />Programming/Planning <br />Architecture/Interior Design <br />Mechanical Engineering/HVAC <br />Electrical Engineering/Lighting <br />Plumbing Engineering/Fire Protection <br />Civil Engineering <br />Construction Administration <br />Cost Estimating <br />LEED <br />Project Cost Dates <br />$6,000,000 2011-2013 <br />Description <br />The two-story facility is approximately <br />31,527 SF including a vehicle wash <br />and fueling facility to accommodate six <br />trolleys and approximately 120 city owned <br />vehicles. The administrative portion <br />includes 12,286 SF of offices, storage, <br />break rooms, distribution center, and <br />other support areas. The maintenance <br />area has garage service bays for trolleys, <br />city owned vehicles, and a bay for <br />tire storage and repair. Scope of work <br />included an emergency generator for the <br />entire building with 48 hours of diesel fuel. <br />PAST 5 <br />YEARS