Laserfiche WebLink
AECOM RFQ No. 15-04-01 <br />Public Involvement <br />AECOM shall conduct public meetings to review the <br />design development stage of the project. AECOM <br />shall provide displays to convey design alternatives, <br />schedules, and costs. AECOM shall conduct working <br />group meetings with the Client staff on a regular basis. <br />Permitting Process <br />The AECOM Team recognizes the importance of <br />expediting the permit approval process. Therefore, <br />our team includes members who are both familiar <br />with and capable of fast-tracking the permit process <br />in South Florida and able to Identify Regulatory/ <br />Permitting Requirements. We will contact regulatory <br />agencies during the preliminary engineering phase <br />of the project, attend pre-application meetings to <br />elicit agencies’ concerns, permitting constraints and <br />required approvals/permits for the project. <br />Construction Engineering Inspection Services <br />The AECOM Team expertise regarding construction <br />inspection services can ensure quality and efficient <br />implementation conforming to the final construction <br />documents and environmental permits and <br />agreements. These services may include conducting <br />a preconstruction meeting; issuance of a conformed <br />set of drawings including the incorporation of addenda <br />and permitting requirements; review of contractor <br />submittals and Requests for Information (RFIs); review <br />of shop drawings (as required) for any components <br />related to the proposed design and issuing <br />architect’s/engineer’s supplemental instructions <br />(ASIs); conducting preconstruction staking and field- <br />marking for earthwork activities and design element <br />location; evaluating and selecting plant materials at <br />nurseries before delivery to a project site; conducting <br />observations of hardscape, landscape, drainage, water <br />& sewer, utility, site furniture, lighting and irrigation <br />system installation and construction while noting any <br />non-conformance with the contract documents which <br />require remedy. In addition, we will review contractor <br />pay applications; issue field orders and change orders <br />as necessary to document changes in the contract <br />documents, conduct preliminary and final punch lists <br />and help facilitate final acceptance of construction. <br />AECOM Quality Management System - (QMS) <br />Quality assurance/quality control (QA/QC) has been <br />one of the keys to AECOM’s success. In North America, <br />AECOM uses a Quality Management System (QMS) <br />based upon well-honed practices that are ISO 9001 <br />(2008) compliant and employed by all of our business <br />lines. This means the following: <br />• We follow requirements designed to consistently <br />meet client needs and applicable regulatory <br />requirements and enhance client satisfaction. <br />• We monitor our conformance to these <br />requirements via annual internal quality audits <br />and ongoing reviews or surveillances. <br />• External quality auditors also monitor our <br />performance. <br />• We take quality very seriously. <br />Sustainable Design Initiatives <br />Recognizing that it is incumbent upon Governmental <br />agencies to be supportive of sustainable design <br />initiatives, we would like to support the City in the <br />design and development of a public / civic building <br />that goes beyond normal Energy Conservation and <br />Sustainable Design standards to incorporates state- <br />of-the-art sustainable design building features <br />including LEED (Leadership in Environmental and <br />Energy Design)-approved MEP Systems, recycled <br />building materials, passive solar design techniques, <br />maximum use of natural light, xeriscaping and other <br />design measures as an example of how buildings <br />should be sustainably developed. AECOM offers the <br />City of Coral Springs LEED Certified Professionals <br />with whom to potentially accomplish this goal. <br />Section D <br />Sunny Isles Beach City Manager, <br />Chris Russo on AECOM <br />“AECOM’s staff was highly involved, <br />very professional through every <br />phase of the project from design to <br />construction plus the staff took great <br />care to ensure that the City’s goals for <br />the project were met.” <br />- Chris Russo <br />9