My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2312
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2312
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2024 3:12:53 PM
Creation date
6/11/2015 11:38:16 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2312
Date (mm/dd/yyyy)
10/16/2014
Description
CO#1 w/PAC Comm for Emergency Seawall Repair
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
«.z <br /> Calvin, Giordano 8 Associates,. Inc. <br /> E X C E P T I O N A L S O L U T I O N S <br /> • It is essential to note that the same auger columns were installed by the same <br /> contractor at a similar setback from:the seawall and at similar intervals along the <br /> Intracoastal Park North as was the case with the Intracoastal Park South. The <br /> wall in the North Park is also of a similar age, and laterally supported through <br /> ' the use of tie-back rods (although in this case they are tied into the cap and not <br /> the columns but in both cases the tie backs are severely corroded). It therefore <br /> stands to reason that the°same cut tie=back:problerns and consequences4nay'arise <br /> to the North Park. <br /> Initially, we had hoped that a solution could be implemented wherein batter <br /> piles could be driven in.front of the existing concrete seawall system and tied <br /> into the cap to prevent-the need for a complete replacement. This methodology <br /> is what the initial'cost proposal was based on. <br /> Upon completion of the emergency repair of the failed seawall, CGA:requested <br /> that the Contractor mobilize to the North Park Wall to perform more extensive <br /> Building Code`Services excavations to confirm the composition, type and method of construction of-the <br /> Coastal Engineering . North Park Wall. During the excavation investigation it Was determined that:the <br /> Code-Enforcement <br /> wall is supported laterally by tie-back rods anchored into the cap. In order to set <br /> Construction Engineering$ <br /> Inspection batter piles in front of the wall, the cap would have to be cut or demolished,. <br /> Construction Services potentially rendering the wall temporarily unsupported and subject to failure <br /> contract coveminent- raid-repair. The existing flange on the T-piles supporting the wall is not of <br /> Data Technologies x' <br /> adequate condition or thickness to support the panels for this method,of repair <br /> ock%ctipmenl q hp h <br /> and appears be_lackin:g any steel rebar. Due to the poor construction observed <br /> • Emer�eiicq tiianagement hh p <br /> services during the excavations it has been,determined that the vibrations.caused by the <br /> Engineering driving of piles in the immediate vicinity of the wall may be enough to damage <br /> Governmental Services <br /> the wall irreparably: <br /> Indoor Air Quality <br /> Landscape.Amhiteeture-& <br /> Envirdnmental>Services. For these reasons, the batter pile & cap repair Solution is recommended to be <br /> Municipal Engineering abandoned-and we recommend a complete wall replacement for the North Park, <br /> Phiniii similar to that being performed on the southernmost portion of the South Park. <br /> Public Administration <br /> Rer+•�-cloprn'rn&.Urban The.requested Change Order from the Contractor to account for this additional <br /> Design scope and cost is $326,047.50. <br /> Renewable Energy <br /> Resort Develo rnent <br /> p We recognize.that the City is conscientious of costs when evaluating alternatives <br /> Surveying Mapping - for repairing and/or replacing seawalls at both Intracoastal Park locations: <br /> Transportation Plannino& <br /> Traffic Engineering: However, it is our opinion that the inherent:risk of allowing the wall to remain <br /> Utility&.Community as--is with good cause to suspect that there is structural.instability is imprudent. <br /> MaintenanceSeruices <br /> water:Resources Management <br /> 1800 Eller Drive,Sirite 600 <br /> Fort._auderdale,FL 33316 <br /> Phone°954.92d_7781 <br /> Fax: <br /> 954.921.8807 <br /> wv'w.cgdsolutibns.com <br /> Fort:Lauderdale west Palm Beach Port St. Lucie homestead Cleaiw;tter Jacksonville Atlanta <br />
The URL can be used to link to this page
Your browser does not support the video tag.