My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kaufman Lynn Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-08-02) CMAR for Government Center Annex at 18080 Collins Ave.
>
Responses
>
Kaufman Lynn Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2015 10:13:06 AM
Creation date
9/24/2015 10:07:41 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management at Risk (CMAR) for 18080 Collins
Bid No. (xx-xx-xx)
15-08-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ No. 15-08-02 <br />Construction Management at Risk for Government Center Annex at 18080 Collins Avenue 7 <br />Evaluating lEEd stratEgiEs to stay “grEEn” whilE staying within thE budgEt <br />Our team of LEED Accredited Professionals has experience evaluating <br />strategies, implementing practices, finding resources and weighing cost/ <br />benefits for each LEED point to blend budget decisions with energy <br />efficient, environmentally-friendly construction. Kaufman Lynn is well <br />versed in providing “green” cost savings alternatives on projects in addition <br />to construction methods to ensure the greatest accumulation of points for <br />building certification. <br />valuE analysis and valuE EnginEEring For EConomiCal imPaCt without <br />saCriFiCing thE vision <br />In the Kaufman Lynn Construction world, Value Engineering optimizes the <br />allocation of projected funds (the budget) without reducing the quality of <br />a project. Unlike many other construction managers, we do not simply try <br />to find a cheaper product that “cheapens the design”, we seek to find more <br />economical but equal or better option that remains consistent with the <br />project team’s vision and life cycle limits. <br />liFE CyClE Cost analysis: making surE that “lEss ExPEnsivE now” doEsn’t <br />translatE to “high long-tErm oPErations Costs” <br />Life Cycle Cost Analysis is an integral part of the value management <br />process, providing an assessment of costs associated with each of the <br />various options under consideration. The life cycle cost for the Government <br />Center Annex is the total economic cost of owning and operating the <br />facility. Life cycle costs can be applied to any component of the facility, but <br />generally focuses on the systems noted in the plumbing, mechanical and <br />electrical plans and specifications. <br />A complete life cycle cost analysis will not only take into account the initial <br />costs of equipment, materials and installation, but also the cost of the future <br />re-installations in present dollars. This is an important point of clarification; if <br />equipment for example has to be replaced every ten years, the costs of inflation <br />that will take place between now and the last replacement needs be considered <br />in the true life cycle cost of the product or system. Utilizing our in-house <br />multidisciplinary estimating capabilities, Kaufman Lynn Construction guides the <br />project team in making informed decisions in the evaluation of all options brought <br />to the table. <br />ExPEriEnCE in Coastal EnvironmEnts assurEs ProPEr matErial sPECiFiCations <br />Kaufman Lynn Construction has been building in South Florida for 26 years. <br />Many of these projects were in close proximity to the ocean. An example is the <br />Pier Parking Garage we are currently building in Pompano Beach. Understanding <br />the corrosive nature of the sea air affects the material choices we make. For <br />example, extruded aluminum will be used instead of steel on exposed finishes <br />such as railing, doors and frames, and light fixtures. Though rebar chairs and form <br />accessories are embedded in concrete and do not appear to be “exposed”, the salt <br />air penetrates the porous material and may cause corrosion of steel inside the <br />concrete which could result in unsightly marks on the building exterior. We avoid <br />this potential maintenance issue, by specifying plastic or aluminum for rebar chairs <br />and form accessories. <br />MIRAMAR CULTURAL ARTS CENTER <br />The initial estimate was considerably over <br />the owner’s budget. Kaufman Lynn analyzed <br />the project for significant cost savings <br />alternatives. Our greatest recommendation (which <br />was accepted) was to change the sound system <br />to a digital system that would still reproduce the <br />same acoustical properties for the environment. <br />Through this, we were able to resize the overall <br />volume (height, etc..) of the building saving <br />on hard costs as well as costs associated with <br />traditional hardware sound systems and acoustical <br />treatments. This recommendation resulted in a <br />$625,000 reduction to the initial estimate. <br />Project Approach & Understanding <br />Section D <br />WE “SHOP” FOR THE BEST VALUE <br />Utilizing an alternative light fixture, whch <br />maintains the aesthetics and coastal <br />ratings of the specified fixture, reduced <br />the cost of the lighting package for the <br />Pompano Beach Pier Parking Garage by <br />$50,000.
The URL can be used to link to this page
Your browser does not support the video tag.