|
RFQ No. 15-08-02
<br />Construction Management at Risk for Government Center Annex at 18080 Collins Avenue 27
<br />CHRIS LONG
<br />Project executive
<br />BACKGROUND
<br />Chris Long has over 28 years experience in both estimating and construction management of
<br />multimillion dollar projects in a variety of market sectors, including education, hospitality, office,
<br />retail and multifamily. He is responsible for guidance and oversight of entire life cycle of the project
<br />including heavy involement in the preconstruction phase. In addition to oversight, additional
<br />primary goals are to ensure quality, accountability and efficiency of all assigned projects.
<br />
<br />EXPERIENCE
<br />Miami Dade College Academic Support Center, Miami, FL — New construction of a 136,000 s.f.
<br />5-story building provides state-of-the-art facilities for recruitment, international student services,
<br />advisement, career center, admissions and registration, bursar, and financial aid services. LEED Gold,
<br />CM at Risk, $25.0 million.
<br />Miramar West Center, Miramar, FL — New construction of a new 4-story, 80,000 s.f. building
<br />including classrooms, science labs, student academic support and administration space. Provides
<br />approximately 580 parking spaces. The project was built on a 20 acre site that includes approximately
<br />9.5 acres of buildable, non-wetland conservation easement area. Design/Build, $23.0 million.
<br />
<br />Palm Beach State College Public Safety Training Facility, Lake Worth, FL — Managed the
<br />preconstruction and construction of a multi-phased public safety training complex inclusive of an
<br />indoor rifle/handgun firing range, fire tower, CEP, classroom building, gymnasium, wellness center
<br />and primary electrical distribution ductbank. $36.2 million.
<br />
<br />FAU Parking Garage, Boca Raton, FL — New construction of a 325,000 s.f., 4-story, 1,000 space
<br />structural precast concrete parking garage for Florida Atlantic University. The garage was constructed
<br />to allow for future retail space on ground floor. CM at Risk, $11.5 million.
<br />
<br />Pompano Beach Parking Garage, Pompano Beach, FL — Design and construction of a 239,646 s.f.,
<br />500-space parking garage in close proximity to the beach. The new garage is the corner piece of the
<br />Pompano Beach Pier Park master development which is planned as a new city destination with new
<br />restaurants, retail shops, and a potential hotel establishment. Design/Build, $19.8 million.
<br />
<br />Broward College Parking Garage, Davie, FL — Managed the preconstruction & construction
<br />of a new 2,000 car precast parking structure. In addition to the construction of the building,
<br />improvements were made to the vehicular circulation as well as the construction of an archway that
<br />provides an architectural element to identify the entrance of the campus. Design/Build, $19.2 million.
<br />
<br />Dadeland Office Building, Miami, FL — New construction of a 15-story office building that included
<br />a parking garage that held over 1,000 cars. $48.0 million.
<br />
<br />Dadeland Mall, Miami, FL — Site improvement and mall overbuild preconstruction. $22.0 million.
<br />
<br />FAU Innovation Village Apartments, Boca Raton, FL — Managed the preconstruction of a new 1,200
<br />bed student housing development. CM at Risk, $66.0 million.
<br />
<br />FAU HBOI Laboratory, Boca Raton, FL — Managed the preconstruction and construction of a new
<br />wet lab facility. CM at Risk, $13.9 million.
<br />EDUCATION
<br />B.S. Construction
<br />Management,
<br />Louisiana State University
<br />
<br />YEARS OF EXPERIENCE
<br />28
<br />
<br />PRESENT OFFICE LOCATION
<br />Kaufman Lynn Main Office
<br />4850 T-Rex Ave., Suite 300
<br />Boca Raton, FL33431
<br />Experience
<br />Section H
|