My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kaufman Lynn Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-08-02) CMAR for Government Center Annex at 18080 Collins Ave.
>
Responses
>
Kaufman Lynn Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2015 10:13:06 AM
Creation date
9/24/2015 10:07:41 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management at Risk (CMAR) for 18080 Collins
Bid No. (xx-xx-xx)
15-08-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ No. 15-08-02 <br />Construction Management at Risk for Government Center Annex at 18080 Collins Avenue 42 <br />inspection to compliment our existing quality <br />control methods and processes. He provides <br />written reports with photographs that are <br />reviewed by the on-site project team in <br />addition to the Project Executive. The reports <br />include corrective actions taken or employed <br />from his observations and discussions with <br />subcontractors and the superintendent. At the <br />conclusion of the project we turn over a <br />complete book to the owner with a full <br />description of what issues were addressed to <br />ensure them of a superior building for years to <br />come. <br /> <br />COST CONTROL <br />In order to acquire accurate cost control for <br />construction projects we use “continuity”. By <br />keeping this key word in mind, we effectively <br />communicate how the estimate was developed <br />to the people who are responsible for the <br />development of job cost reporting. We <br />accomplish this through open lines of <br />communication and established accurate and <br />highly detailed cost coding that both the <br />Project Manager and Superintendent <br />understand and implement. Both Project <br />Manager and Superintendent are responsible <br />for accurately cost coding all invoices and <br />subcontractor requisitions. Using Timberline <br />Accounting software, our accounting department <br />then inputs this information along with project payroll <br />and incidentals to create the Job Cost Report and Job <br />Transaction Report. These reports are then published <br />on a weekly basis for review by the Project Executive, <br />Project Manager and Superintendent. <br />TRANSPARENCY AND METHODS USED <br />FOR BIDDING OUT THE DIVISIONS OF <br />WORK idEntiFying QualiFiEd biddErs through FaCE-to-FaCE workshoPs <br />Prior to bidding the project, we generate market <br />awareness. Along with the already existing <br />subcontractor relationships in the region and working <br />with the Chamber of Commerce, the local ABC and AGC <br />offices, and other South Florida trade organizations, <br />Kaufman Lynn Construction will initiate project trade <br />workshops. These workshops provide all interested <br />subcontractors and vendors the opportunity to: 1) <br />meet with the project team, 2) review and discuss the <br />plans and specification and the project in general, and <br />Project Management Services <br />Section K <br />IDENTIFYING QUALIFIED BIDDERS THROUGH FACE-TO-FACE WORKSHOPS <br />Prior to bidding the project, we generate market awareness. Along with the <br />already existing subcontractor relationships in the region and working with <br />the Chamber of Commerce, the local ABC and AGC offices, and other South <br />Florida trade organizations, Kaufman Lynn Construction initiates project <br />trade workshops. These workshops provide all interested subcontractors <br />and vendors the opportunity to: 1) meet with the project team, 2) review <br />and discuss the plans and specification and the project in general, and 3) get <br />clear understanding of timelines and sequencing of activity. These face to <br />face sessions are invaluable to provide assessment of the trade and vendor <br />capability, notwithstanding workload and labor resource. <br />MIAMI DADE COLLEGE ADMINISTRATIVE SUPPORT CENTER <br />COST CONTROL CASE STUDY <br />“Do we really need a tower crane?” Sometimes the answer is “yes”, sometimes it’s “no” <br />and sometimes contractors don’t even look at the option at all. To ensure our Owners <br />reap every nickel we can find, we create staging and logistics plans very early during <br />design to review alternative construction means and methods as they relate to “how” <br />we’re going to build a project. For example: on multi-story buildings - do we really <br />need a tower crane? Our five-story Student Services project for Miami Dade College <br />would historically be an “automatic” for a tower crane. However, after creating a <br />logistics plan which identified crane paths, we showed our structural subconsultants <br />that we could use a crawler crane instead to accomplish the same work in the same <br />amount of time with the same quality. Instead of paying $270,000 for five months for <br />two tower cranes, we paid $120,000 for two crawlers and saved the College $150,000 – <br />more than 50% off the initial cost.
The URL can be used to link to this page
Your browser does not support the video tag.