My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Weitz Company, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-08-02) CMAR for Government Center Annex at 18080 Collins Ave.
>
Responses
>
The Weitz Company, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2016 11:18:53 AM
Creation date
9/24/2015 10:16:59 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management at Risk (CMAR) 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-08-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE WEITZ COMPANY // GOVERNMENT CENTER ANNEX, RFQ NO. 15-08-02 / CITY OF SUNNY ISLES BEACH, FL 28 <br />SECTION F // RELATED EXPERIENCE <br />CLIENT <br />West Des Moines Community Schools <br />Dr. Tom Narak, 515.633.5025 <br />narakt@wdmcs.org <br />ARCHITECT <br />RDG Planning and Design <br />Craig Bullis, 515.288.3141 <br />cbullis@rdgusa.com <br />SIZE AND COST <br />345,000 SF // $65.5 Million <br />STATUS <br />Completed 2014 <br /> <br />DESCRIPTION <br />As the largest high school in Iowa, Valley High is home to 1,900 students and <br />staff. The Weitz Company served as Construction Manager for this project, <br />which was completed in three phases. A 3-story addition (110,000 SF) was <br />built to the southwest of the existing building to house 12 science classrooms <br />and labs. A two-story 71,000 square-foot academic addition was completed, <br />as well as single-story 32,000 square-foot administrative and student <br />common areas. Seventy-seven classrooms were renovated, along with a full <br />renovation of the existing auditorium space to create new vocal, orchestra, and <br />drama rooms. A physical plant was added to hold the “heart” of the mechanical <br />systems for the building, plus a new automotive academic teaching area. The <br />first two phases of this project were turned over early and within the project <br />budget. <br />VALLEY HIGH SCHOOL IMPROVEMENTS <br />WEST DES MOINES, IA
The URL can be used to link to this page
Your browser does not support the video tag.