My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Emerald Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-08-02) CMAR for Government Center Annex at 18080 Collins Ave.
>
Responses
>
Emerald Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2015 10:25:13 AM
Creation date
9/24/2015 10:21:41 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management at Risk (CMAR) 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-08-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K. PROJECT MANAGEMENT SERVICES <br />1.OPTIONS ANALYSIS <br />Because of our deep portfolio of “hard-bid” experience, our team is particularly adept at scoping <br />projects. As CMc, we work with owners to determine project requirements and create an effective <br />work scope. By analyzing options, we determine the most practical and cost effective manner <br />to complete the project efficiently while adhering to budget, time, and project intent constraints. <br />2. DESIGN REVIEW <br />Working with the Design Team, we first ensure a mutual understanding of the Client’s needs. With <br />this understanding, we then take the time to thoroughly review and analyze project plans and <br />specifications to determine initial costs, schedule implications, and value engineering alternatives. <br />Our estimators’ review also reveals discrepancies, conflicts, and potential constructability <br />problems, which minimizes the potential changes and/or delays. <br />Optimum review ensures that design: <br />• meets programming, planning, or statutory requirements <br />• is complete, at least for the portion of work that is to be bid <br />• is coordinated, buildable, and able to be maintained <br />• risk is minimal and its allocation is clear <br />3. BUDGET ESTIMATING <br />Utilizing historical cost data, updated with our knowledge of market conditions and subcontractor <br />pricing from specialty trades, Paschen will prepare a comprehensive Initial Budget. Architectural <br />features and building elements, as well as the systems – structural, mechanical, electrical, <br />plumbing, etc. – are also defined and assigned preliminary costs. This will give the entire project <br />team, including the Owner, Design Team, and Contractor, an understanding of the project cost <br />and the components that make up the budget. All future budgets will be compared to the initial <br />budget. <br />The second estimate defines the cost of individual elements, including specific equipment and <br />selected materials and finishes. From this point, problem areas with respect to cost are identified <br />for evaluation. While brainstorming and initial discussions with regard to value engineering may <br />have begun during the first estimate, this is when options begin to be explored in earnest. <br />Our next step will be to prepare a Guaranteed Maximum Price (GMP) proposal for the project, <br />which will include a bid package breakdown. The GMP will be prepared using in-house estimates <br />and subcontractor pricing for specialty trades. During construction, the cost of the project is <br />reviewed continuously to make sure that it remains on budget and that the Owner gets the most <br />benefit for the cost. We will review the documents as they are produced by the Design Team <br />and evaluate ways to save money, time, and improve quality. <br />4. VALUE ENGINEERING <br />Our primary objective, when it comes to value engineering, is to deliver equivalent construction <br />quality at a reduced cost. Ideally, we aim to discover efficiencies that produce greater quality <br />in the final project, at an equal, possibly even reduced cost compared to the initial budget. On <br />almost every project, there are just as many value engineering alternatives that involve material <br />and equipment substitutions as there are options to simplify the
The URL can be used to link to this page
Your browser does not support the video tag.