Laserfiche WebLink
CM <br />A <br />R <br /> <br />fo <br />R G <br />ov <br />e <br />RnMen <br />t <br /> C <br />en <br />t <br />e <br />R A <br />nn <br />e <br />x <br /> At 1 <br />8 <br />0 <br />8 <br />0 <br /> <br />C <br />ol <br />l <br />i <br />n <br />s <br /> A <br />ve <br />n <br />u <br />e <br />| <br />R <br />eq <br />u <br />e <br />s <br />t <br /> fo <br />R quAli <br />f <br />i <br />CA <br />ti <br />o <br />n <br />s <br /> | <br /> <br />no. <br />1 <br />5 <br />- <br />0 <br />8 <br />- <br />0 <br />2 <br />35Construction with a Personal Touch <br />MASTER SCHEDULE UPDATES <br />Throughout the life of the project, the schedule will be used to gauge the impact of scope changes and <br />an-ticipated problems, and to develop strategies for maintaining the overall time frame. The schedule will <br />be updated bi-weekly (more frequently if the City requires) to show actual progress against the project’s <br />baseline schedule expectations. This enables the current status of the project to be rapidly determined, and <br />if the updated schedules indicate a slippage, problem areas are immediately identified and subcontractors <br />are brought together to organize a recovery schedule. <br />COORDINATING SUBMITTALS WITH THE CONSTRUCTION SCHEDULE <br />One of the keys to effective project management is knowing that the procurement process should serve the <br />construction schedule, not the other way around. If work on the jobsite is to proceed smoothly, then the <br />material must reach the project before it is to be installed. Otherwise, the work sequence is interrupted and <br />must be altered to accommodate disjointed delivery schedules. <br />The best way to ensure timely material delivery is to treat the assembly of submittal data, the assembly of <br />shop drawing data, and their procurement as activities, just like the construction activities. These activities <br />will be assigned durations and their relationship to predecessor and successor activities will be clearly <br />defined. <br /> <br />SUBCONTRACTOR SCHEDULE ADHERENCE <br />As part of the bidding process, subcontractors are required to review and comply with the milestones <br />established in the Master Schedule. The trade contractors are required to submit schedules for their work <br />that conform to the overall parameters of the Master Schedule, and will be required to cost-load and or <br />crew-load their schedules as necessary to maintain consistency with the Master Schedule. Our team will <br />coordinate these various trade schedules and generate one master CPM schedule, for the project, which <br />includes appropriate sequencing restraints between trades. Monitoring of these schedules and manpower <br />will be a central focus of our weekly subcontractor/jobsite coordination meetings. <br />QUALITY CONTROL <br />For MCM, its commitment to safety and delivering quality projects is <br />one of its highest priorities. So much so, that MCM is one of the few <br />contractors in Florida that has obtained the ISO: 9001 certification. <br />To achieve this certification, a construction manager must meet the <br />stringent requirements of the International Standards Organization (ISO) <br />for procedures and documentation necessary to assure the highest level <br />of quality and customer satisfaction. ISO standards are internationally- <br />recognized as the highest standards for quality control. Throughout <br />construction, MCM’s Project Executive, Joe Fernandez will audit the <br />project to confirm that ISO: 9001 procedures are followed and as part of <br />our quality process, Sunny Isles Beach will be interviewed periodically by <br />MCM to ensure customer satisfaction. <br />MCM believes that its commitment to quality emanates from our <br />fundamental corporate philosophy of delivering total client satisfaction, <br />and our uncompromising commitment to delivering excellence. In our <br />search for continued quality improvement, MCM emphasizes job-specific <br />training, and insists on safe, clean, drug free jobsites. This corporate <br />philosophy ensures that our personnel (MCM’s most valuable resource) <br />have the proper foundation to deliver the standard of quality MCM is <br />known for. <br />PROJECT MANAGEMENT SERVICES <br />“Quality is not an act, it <br />is a habit” <br />- Aristotle <br />MCM understands the need for <br />a growing City like Sunny Isles <br />Beach to build a Government <br />Center Annex, and the need <br />to deliver a safe, functional, <br />aesthetically pleasing product. <br />As such, special attention will be <br />given to delivering the highest <br />level of quality our industry can <br />safely produce at every phase of <br />the project.