F. Related Experience
<br />City of Sunny Isles Beach | Request for Qualifications No. 15-08-02
<br />September 23, 2015
<br />Page 13
<br />PROJECT
<br />NAME
<br />DELIVERY
<br />METHOD SCOPE OF WORK REFERENCE INFORMATION
<br />(Owner & Architect)
<br />CONSTRUCTION
<br />COST SIZE
<br />START DATE /
<br />COMPLETION
<br />DATE
<br />STATUS
<br />PROFESSIONALS
<br />ASSIGNED TO
<br />THIS CONTRACT
<br />Bethune-
<br />Cookman
<br />University
<br />Housing
<br />Daytona Beach,
<br />FL
<br />Design-Build
<br />Hensel Phelps has been engaged by TG
<br />Quantum, LLC to develop and build a
<br />$70M student housing project on Bethune-
<br />Cookman’s campus in Daytona Beach,
<br />Florida. The Bethune-Cookman Student
<br />Housing project will house over 1,200
<br />incoming freshmen when completed.
<br />Construction on the four buildings, totaling
<br />just under 300,000 SF, is set to begin Fall
<br />of 2014 with an aggressive schedule that
<br />will complete mid 2016. This project will
<br />involve all three Groups of Hensel Phelps:
<br />Development, Construction, and Services.
<br />OWNER: TG Quantum, LLC
<br />Frank Knott, Jr., Managing Director
<br />8455 Colesville Road, Suite 800,
<br />Silver Spring, MD 20910
<br />240.652.2251 | FJK@QuantumRealtyCapital.com
<br />ARCHITECT: Torti Gallas and Partners, Inc.
<br />Thomas McManus, Associate
<br />1300 Spring St, Fourth Floor,
<br />Silver Spring, MD 20910
<br />301.588.4800 | TMcManus@tortigallas.com
<br />$59 Million 300,000 SF November 2014 /
<br />June 2016 In Progress Reno Knowles
<br />Modify
<br />Vehicle
<br />Assembly
<br />Building
<br />(VAB) High
<br />Bay 3 for SLS
<br />Kennedy Space
<br />Center, FL
<br />Design-Bid-
<br />Build
<br />The work consists of removal and storage of
<br />existing system components, equipment, and
<br />materials for reuse/reinstallation; demolition of
<br />system components; modification of structural
<br />elements and installation of new structural
<br />elements; and installation of new systems,
<br />equipment, and materials. Demolition and
<br />construction will take place in High Bay
<br />(HB) 3 with some ancillary systems, such
<br />as electrical and communication cable tray
<br />connecting HB3 to the Launch Control Center
<br />(LCC). A total of ten new vehicle access
<br />platforms, vehicle specific inserts, and related
<br />mechanical, electrical, and life safety systems
<br />will be constructed.
<br />OWNER: National Aeronautics and Space
<br />Administration (NASA)
<br />Bradley O’Toole, Contracting Officer
<br />Kennedy Space Center, SR 405, Florida 32899
<br />321.867.2139 | bradley.n.otoole@nasa.gov
<br />ARCHITECT: RS&H (Reynolds, Smith and Hills)
<br />John Kercsmar, Project Manager
<br />115 Alma Blvd #101, Merritt Island, FL 32953
<br />321.453.0212 | john.kercsmar@rsandh.com
<br />$118 Million 350,000 SF March 2014 /
<br />March 2016 In Progress N/A
<br />Air Force
<br />Technical
<br />Applications
<br />Center
<br />(AFTAC)
<br />Patrick Air Force
<br />Base, FL
<br />Design-Build
<br />Multi-story command and central
<br />headquarters, 276,000 SF, for 1,500 staff
<br />conducting 24/7/365 satellite, geophysical,
<br />and hydroacoustic analysis operations.
<br />Highbay warehouse, SCIFS and Class 100
<br />cleanrooms included. Radio chemistry
<br />laboratory, 38,000 SF, for 50 staff divided
<br />into four separate suites; sample analysis,
<br />radiochemistry analysis, alpha/beta/gamma
<br />counting, and spectrometry analysis.The
<br />project will also include a stand-alone Central
<br />Utility Plant, 18,000 SF, with UPS systems and
<br />a stand-alone parking garage for 600 cars,
<br />not to exceed 180,000 SF.
<br />OWNER: U.S. Army Corps of Engineers
<br />Dennis Newell, Area Engineer
<br />1142 Jupiter St., Building 535
<br />Patrick Air Force Base, FL 32925
<br />321.867.3464 | Dennis.W.Newell@usace.mil
<br />ARCHITECT: HOK
<br />David Reeses, Senior Vice President
<br />3200 SW Freeway, Ste 900, Houston, TX 77027
<br />713.407.7700 | david.reese@hok.com
<br />$158 Million 337,400 SF January 2012 /
<br />December 2015 In Progress Dave Morin
<br />All Projects in Florida, Exceeding $1 Million, that Started in the Past 5 Years
|