Laserfiche WebLink
F. Related Experience <br />City of Sunny Isles Beach | Request for Qualifications No. 15-08-02 <br />September 23, 2015 <br />Page 13 <br />PROJECT <br />NAME <br />DELIVERY <br />METHOD SCOPE OF WORK REFERENCE INFORMATION <br />(Owner & Architect) <br />CONSTRUCTION <br />COST SIZE <br />START DATE / <br />COMPLETION <br />DATE <br />STATUS <br />PROFESSIONALS <br />ASSIGNED TO <br />THIS CONTRACT <br />Bethune- <br />Cookman <br />University <br />Housing <br />Daytona Beach, <br />FL <br />Design-Build <br />Hensel Phelps has been engaged by TG <br />Quantum, LLC to develop and build a <br />$70M student housing project on Bethune- <br />Cookman’s campus in Daytona Beach, <br />Florida. The Bethune-Cookman Student <br />Housing project will house over 1,200 <br />incoming freshmen when completed. <br />Construction on the four buildings, totaling <br />just under 300,000 SF, is set to begin Fall <br />of 2014 with an aggressive schedule that <br />will complete mid 2016. This project will <br />involve all three Groups of Hensel Phelps: <br />Development, Construction, and Services. <br />OWNER: TG Quantum, LLC <br />Frank Knott, Jr., Managing Director <br />8455 Colesville Road, Suite 800, <br />Silver Spring, MD 20910 <br />240.652.2251 | FJK@QuantumRealtyCapital.com <br />ARCHITECT: Torti Gallas and Partners, Inc. <br />Thomas McManus, Associate <br />1300 Spring St, Fourth Floor, <br />Silver Spring, MD 20910 <br />301.588.4800 | TMcManus@tortigallas.com <br />$59 Million 300,000 SF November 2014 / <br />June 2016 In Progress Reno Knowles <br />Modify <br />Vehicle <br />Assembly <br />Building <br />(VAB) High <br />Bay 3 for SLS <br />Kennedy Space <br />Center, FL <br />Design-Bid- <br />Build <br />The work consists of removal and storage of <br />existing system components, equipment, and <br />materials for reuse/reinstallation; demolition of <br />system components; modification of structural <br />elements and installation of new structural <br />elements; and installation of new systems, <br />equipment, and materials. Demolition and <br />construction will take place in High Bay <br />(HB) 3 with some ancillary systems, such <br />as electrical and communication cable tray <br />connecting HB3 to the Launch Control Center <br />(LCC). A total of ten new vehicle access <br />platforms, vehicle specific inserts, and related <br />mechanical, electrical, and life safety systems <br />will be constructed. <br />OWNER: National Aeronautics and Space <br />Administration (NASA) <br />Bradley O’Toole, Contracting Officer <br />Kennedy Space Center, SR 405, Florida 32899 <br />321.867.2139 | bradley.n.otoole@nasa.gov <br />ARCHITECT: RS&H (Reynolds, Smith and Hills) <br />John Kercsmar, Project Manager <br />115 Alma Blvd #101, Merritt Island, FL 32953 <br />321.453.0212 | john.kercsmar@rsandh.com <br />$118 Million 350,000 SF March 2014 / <br />March 2016 In Progress N/A <br />Air Force <br />Technical <br />Applications <br />Center <br />(AFTAC) <br />Patrick Air Force <br />Base, FL <br />Design-Build <br />Multi-story command and central <br />headquarters, 276,000 SF, for 1,500 staff <br />conducting 24/7/365 satellite, geophysical, <br />and hydroacoustic analysis operations. <br />Highbay warehouse, SCIFS and Class 100 <br />cleanrooms included. Radio chemistry <br />laboratory, 38,000 SF, for 50 staff divided <br />into four separate suites; sample analysis, <br />radiochemistry analysis, alpha/beta/gamma <br />counting, and spectrometry analysis.The <br />project will also include a stand-alone Central <br />Utility Plant, 18,000 SF, with UPS systems and <br />a stand-alone parking garage for 600 cars, <br />not to exceed 180,000 SF. <br />OWNER: U.S. Army Corps of Engineers <br />Dennis Newell, Area Engineer <br />1142 Jupiter St., Building 535 <br />Patrick Air Force Base, FL 32925 <br />321.867.3464 | Dennis.W.Newell@usace.mil <br />ARCHITECT: HOK <br />David Reeses, Senior Vice President <br />3200 SW Freeway, Ste 900, Houston, TX 77027 <br />713.407.7700 | david.reese@hok.com <br />$158 Million 337,400 SF January 2012 / <br />December 2015 In Progress Dave Morin <br />All Projects in Florida, Exceeding $1 Million, that Started in the Past 5 Years