My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hensel Phelps
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-08-02) CMAR for Government Center Annex at 18080 Collins Ave.
>
Responses
>
Hensel Phelps
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2015 10:41:03 AM
Creation date
9/24/2015 10:38:42 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management at Risk (CMAR) 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-08-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Related Experience <br />City of Sunny Isles Beach | Request for Qualifications No. 15-08-02 <br />September 23, 2015 <br />Page 17 <br />PROJECT <br />NAME <br />DELIVERY <br />METHOD SCOPE OF WORK REFERENCE INFORMATION <br />(Owner & Architect) <br />CONSTRUCTION <br />COST SIZE <br />START DATE / <br />COMPLETION <br />DATE <br />STATUS <br />PROFESSIONALS <br />ASSIGNED TO <br />THIS CONTRACT <br />U.S. Southern <br />Command <br />Headquarters <br />(SOUTHCOM) <br />Miami-Doral, FL <br />Design-Build <br />Design-build, main four-story, 640,000 <br />SF headquarters building of new offices, <br />40,000 SF of conference space, a command <br />suite, a large computer center and multiple <br />conference rooms in a bridge arrangement <br />overlooking a command center. Additional <br />buildings include the Conference Center <br />of the Americas with a conference center <br />and auditorium, and a 150,000 SF Services <br />building for a new child development center, <br />a health and medical center, fitness center, <br />warehouse facilities, loading docks and <br />central utility plant. <br />OWNER: U.S. Army Corps of Engineers <br />Dennis Newell, Area Engineer <br />1142 Jupiter St., Building 535 <br />Patrick Air Force Base, FL 32925 <br />321.867.3464 | Dennis.W.Newell@usace.mil <br />ARCHITECT: HOK <br />David Reese, Senior Vice President | Architect <br />3200 SW Freeway Ste 900, Houston, TX 77027 <br />717.407.7700 | david.reese@hok.com <br />$283.9 Million 640,000 SF June 2008 / <br />October 2010 Complete <br />Derek Hoffine <br />Chad Thompson <br />Reno Knowles <br />Dave Morin <br />Matthew Wilson <br />NASA Mobile <br />Launcher <br />Kennedy Space <br />Center, FL <br />Design-Bid- <br />Build <br />Mobile Launcher for next generation space <br />exploration program, to be used for assembly, <br />testing, and servicing areas at existing KSC <br />facilities, to transport rockets to launch pad, <br />and provide ground support for launches. <br />Comprised of main support structure (the <br />base, multi-platform 406-foot tall tower, and <br />facility ground systems) which includes <br />power, communications, conditioned air, <br />water for cooling, wash-down, and ignition <br />over-pressure protection. <br />OWNER: National Aeronautics and Space <br />Administration (NASA) <br />Krista Shaffer, Senior Field Manager <br />Kennedy Space Center, SR 405, Florida 32899 <br />321.867.3337 | krista.shaffer@nasa.gov <br />ARCHITECT: RS&H <br />John Kercsmar, Project Manager <br />115 Alma Blvd #101, Merritt Island, FL 32953 <br />321.453.0212 | john.kercsmar@rsandh.com <br />$144.1 Million 79,478 SF May 2008 / <br />October 2010 Complete Dave Morin <br />All Projects in Florida, Exceeding $1 Million, that Started in the Past 5 Years
The URL can be used to link to this page
Your browser does not support the video tag.