Laserfiche WebLink
F. Related Experience <br />City of Sunny Isles Beach | Request for Qualifications No. 15-08-02 <br />September 23, 2015 <br />Page 16 <br />PROJECT <br />NAME <br />DELIVERY <br />METHOD SCOPE OF WORK REFERENCE INFORMATION <br />(Owner & Architect) <br />CONSTRUCTION <br />COST SIZE <br />START DATE / <br />COMPLETION <br />DATE <br />STATUS <br />PROFESSIONALS <br />ASSIGNED TO <br />THIS CONTRACT <br />Benjamin <br />P. Grogan <br />and Jerry L. <br />Dove Federal <br />Building <br />Miramar, FL <br />Design-Build <br />The U.S. General Services Administration <br />selected Hensel Phelps as the Design-Builder <br />for the Benjamin P. Grogan and Jerry L. Dove <br />Federal Building project in Miramar, Florida. <br />Totaling 383,000 SF, this project consolidates <br />a Federal agency’s forces, which were <br />previously spread across 12 different <br />locations in South Florida. With a construction <br />cost of $160 million, this LEED Platinum C&S <br />and Gold CI project includes enhanced <br />security specifications, an enclosed parking <br />structure, and multiple buildings on a 20-acre <br />site. <br />OWNER: General Services Administration (GSA) <br />Steven Smith, Project Manager <br />77 Forsyth Street, Ste G40, Atlanta, GA 30303 <br />404.331.0895 | Steven.C. Smith@gsa.gov <br />ARCHITECT: Gensler <br />James Wallace, Architect <br />1 East Pratt Street, Ste 202, Baltimore, MD 21202 <br />410.539.8743 | james_wallace@gensler.com <br />$159.4 Million 383,000 SF March 2012 / <br />October 2014 Complete <br />Coretta Sweet <br />Derek Hoffine <br />Matthew Wilson <br />Chad Thompson <br />Luis Resendiz <br />Dave Morin <br /> <br />Transformers: <br />The Ride 3D <br />Orlando, FL <br />Design-Build <br />Fast-tracked, design-build project to <br />construct the new, 90,000 SF ride; <br />Transformers: The Ride 3-D at Universal <br />Studios in Orlando, FL. Project site was <br />located in the middle of the park with limited <br />access and maintaining fully operational park <br />operations. <br />OWNER: Universal Orlando <br />Charlie Gundacker, PE, Senior Vice President of <br />Attraction Development <br />6300 Hollywood Way, Orlando, FL 32819 <br />407.363.8841 | charlie.gundacker@nbcuni.com <br />ARCHITECT: BRPH Architects <br />Randy Thron, Senior Vice President <br />935 Lake Baldwin Ln # 200, Orlando, FL 32814 <br />321.751.3003 | ret@brph.com <br />$37.9 Million 90,000 SF June 2012 / <br />March 2013 Complete N/A <br />7th Special <br />Forces <br />Complex <br />Eglin AFB, FL <br />Design- <br />Bid-Build <br />Construction of group headquarters, battalion <br />headquarters/company operations facility, <br />combat readiness training facility, group <br />support battalion headquarters/company <br />operations facility, and dining hall. Includes <br />clearing, grubbing, grading and stabilization <br />of 350-acre containment site and 130-acre <br />access road, and construction of a road <br />system and infrastructure. <br />OWNER: USACE Mobile <br />Robert Schodlbauer, Project Manager <br />109 St. Joseph St, P.O. Box 2288 Mobile, AL 36628- <br />0001 <br />251.471.5966 | <br />robert.a.schodlbauer@sam.usace.army.mil <br />ARCHITECT: Bullock Tice Associates <br />Larry Adams, Asociate Partner <br />909 E. Cervantes, St, Pensacola, FL 32501 <br />850.434.5444 | l.adams@bulltice.com <br />$178.7 Million 684,061 SF August 2011 / <br />February 2009 Complete Derek Hoffine <br />All Projects in Florida, Exceeding $1 Million, that Started in the Past 5 Years