F. Related Experience
<br />City of Sunny Isles Beach | Request for Qualifications No. 15-08-02
<br />September 23, 2015
<br />Page 16
<br />PROJECT
<br />NAME
<br />DELIVERY
<br />METHOD SCOPE OF WORK REFERENCE INFORMATION
<br />(Owner & Architect)
<br />CONSTRUCTION
<br />COST SIZE
<br />START DATE /
<br />COMPLETION
<br />DATE
<br />STATUS
<br />PROFESSIONALS
<br />ASSIGNED TO
<br />THIS CONTRACT
<br />Benjamin
<br />P. Grogan
<br />and Jerry L.
<br />Dove Federal
<br />Building
<br />Miramar, FL
<br />Design-Build
<br />The U.S. General Services Administration
<br />selected Hensel Phelps as the Design-Builder
<br />for the Benjamin P. Grogan and Jerry L. Dove
<br />Federal Building project in Miramar, Florida.
<br />Totaling 383,000 SF, this project consolidates
<br />a Federal agency’s forces, which were
<br />previously spread across 12 different
<br />locations in South Florida. With a construction
<br />cost of $160 million, this LEED Platinum C&S
<br />and Gold CI project includes enhanced
<br />security specifications, an enclosed parking
<br />structure, and multiple buildings on a 20-acre
<br />site.
<br />OWNER: General Services Administration (GSA)
<br />Steven Smith, Project Manager
<br />77 Forsyth Street, Ste G40, Atlanta, GA 30303
<br />404.331.0895 | Steven.C. Smith@gsa.gov
<br />ARCHITECT: Gensler
<br />James Wallace, Architect
<br />1 East Pratt Street, Ste 202, Baltimore, MD 21202
<br />410.539.8743 | james_wallace@gensler.com
<br />$159.4 Million 383,000 SF March 2012 /
<br />October 2014 Complete
<br />Coretta Sweet
<br />Derek Hoffine
<br />Matthew Wilson
<br />Chad Thompson
<br />Luis Resendiz
<br />Dave Morin
<br />
<br />Transformers:
<br />The Ride 3D
<br />Orlando, FL
<br />Design-Build
<br />Fast-tracked, design-build project to
<br />construct the new, 90,000 SF ride;
<br />Transformers: The Ride 3-D at Universal
<br />Studios in Orlando, FL. Project site was
<br />located in the middle of the park with limited
<br />access and maintaining fully operational park
<br />operations.
<br />OWNER: Universal Orlando
<br />Charlie Gundacker, PE, Senior Vice President of
<br />Attraction Development
<br />6300 Hollywood Way, Orlando, FL 32819
<br />407.363.8841 | charlie.gundacker@nbcuni.com
<br />ARCHITECT: BRPH Architects
<br />Randy Thron, Senior Vice President
<br />935 Lake Baldwin Ln # 200, Orlando, FL 32814
<br />321.751.3003 | ret@brph.com
<br />$37.9 Million 90,000 SF June 2012 /
<br />March 2013 Complete N/A
<br />7th Special
<br />Forces
<br />Complex
<br />Eglin AFB, FL
<br />Design-
<br />Bid-Build
<br />Construction of group headquarters, battalion
<br />headquarters/company operations facility,
<br />combat readiness training facility, group
<br />support battalion headquarters/company
<br />operations facility, and dining hall. Includes
<br />clearing, grubbing, grading and stabilization
<br />of 350-acre containment site and 130-acre
<br />access road, and construction of a road
<br />system and infrastructure.
<br />OWNER: USACE Mobile
<br />Robert Schodlbauer, Project Manager
<br />109 St. Joseph St, P.O. Box 2288 Mobile, AL 36628-
<br />0001
<br />251.471.5966 |
<br />robert.a.schodlbauer@sam.usace.army.mil
<br />ARCHITECT: Bullock Tice Associates
<br />Larry Adams, Asociate Partner
<br />909 E. Cervantes, St, Pensacola, FL 32501
<br />850.434.5444 | l.adams@bulltice.com
<br />$178.7 Million 684,061 SF August 2011 /
<br />February 2009 Complete Derek Hoffine
<br />All Projects in Florida, Exceeding $1 Million, that Started in the Past 5 Years
|