My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hensel Phelps
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(15-08-02) CMAR for Government Center Annex at 18080 Collins Ave.
>
Responses
>
Hensel Phelps
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2015 10:41:03 AM
Creation date
9/24/2015 10:38:42 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management at Risk (CMAR) 18080 Collins Ave.
Bid No. (xx-xx-xx)
15-08-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Related Experience <br />City of Sunny Isles Beach | Request for Qualifications No. 15-08-02 <br />September 23, 2015 <br />Page 15 <br />PROJECT <br />NAME <br />DELIVERY <br />METHOD SCOPE OF WORK REFERENCE INFORMATION <br />(Owner & Architect) <br />CONSTRUCTION <br />COST SIZE <br />START DATE / <br />COMPLETION <br />DATE <br />STATUS <br />PROFESSIONALS <br />ASSIGNED TO <br />THIS CONTRACT <br />Orbital <br />Processing <br />Facility <br />(OPF) 1 & 2 <br />Modifications <br />Kennedy Space <br />Center, FL <br />Design-Build <br />This project includes the selective demolition <br />and modernization of 61,000 SF of Orbiter <br />Processing Facility #1 at Kennedy Space <br />Center, Florida. The existing Orbiter Support <br />Stand in the bay was a “freestanding” <br />structural steel platform system interlaced <br />with mechanical, electrical, communications, <br />and high-pressure fluids systems, which <br />were entirely removed during the selective <br />demolition phase. The modernization of this <br />facility includes a new ESD epoxy flooring <br />system throughout (the floor is half ESP and <br />half non-ESP) the high bay and refurbishment <br />of the existing air handling units to support a <br />Class 100,000 clean work environment. <br />OWNER: The Boeing Company <br />Steve Shannon, Florida Site Manager <br />9950 Airtran Blvd, Orlando, FL 32827 <br />321.853.0436 | stphen.m.shannon@boeing.com <br />ARCHITECT: BRPH <br />Dave Hertzler, Senior Project Manager <br />5700 N Harbor City Blvd., #400, Melbourne, FL 32940 <br />321.254.7666 | dhertzler@brph.com <br />$22 Million 61,000 SF October 2013 / <br />December 2014 Complete N/A <br />Universal <br />CityWalk <br />Venue <br />Renovations <br />Orlando, FL <br />CM@Risk <br />The Universal CityWalk® Renovations include <br />ten newly renovated venues, including new <br />Italian and Mexican restaurants, a Hot Dog <br />Hall of Fame, and The Cowfish™, which <br />serves burgers and sushi. Also on tap: a new <br />130-seat Starbucks®, a Coldstone Creamery, <br />Menchies Yogurt Shop and a Bread Box, <br />which sells handcrafted sandwiches next <br />to the movie theater upstairs. The Mexican <br />restaurant, called Antojitos, is situated in <br />the old Latin Quarter facade. The Universal <br />Store at CityWalk® also underwent extensive <br />renovations. All of these projects were <br />completed while CityWalk® remained fully <br />operational. Strategic phasing was key to <br />minimizing impacts to the venues. <br />OWNER: Universal Orlando <br />Harold Stirling, Project Director <br />6300 Hollywood Way, Orlando, FL 32819 <br />407.224.7207 <br />harold.stirling@universalorlando.com <br />ARCHITECT: Universal Creative <br />Randy Mariano, Sernior Director of Project Devel. <br />6300 Hollywood Way, Orlando, FL 32819 <br />704.224.5389 <br />randolph.mariano@universalorlando.com <br />$35 Million 70,000 SF August 2013 / <br />October 2014 Complete Chris Twohig <br />All Projects in Florida, Exceeding $1 Million, that Started in the Past 5 Years
The URL can be used to link to this page
Your browser does not support the video tag.