Laserfiche WebLink
K. Project Management Services <br />City of Sunny Isles Beach | Request for Qualifications No. 15-08-02 <br />September 23, 2015 <br />Page 31 <br />Hensel Phelps approach is centered on <br />the philosophy of building trust through <br />transparency, open communication, <br />and accountability. Hensel Phelps <br />communication and collaboration plan will <br />be implemented by the use of many tools <br />developed to manage and communicate <br />status and progress with respect to all <br />aspects of project delivery – cost, schedule, <br />quality, and safety. Hensel Phelps will utilize <br />these tools coupled with coordination <br />meetings, partnering, and reporting status <br />on a regular basis. Monthly reports will be <br />provided which will give a complete project <br />status. <br />On the following pages you will find an <br />elaboration on the following ten points: <br />1. Design Management Reviews: Architects <br />and Engineers (“A/E”) Coordination <br />2. Constructability Analysis and Planning <br />3. Budget Estimating / Value Engineering <br />4. Procurement of Subcontractors <br />5. Construction Scheduling <br />6. Cost Control <br />7. Quality Control <br />8. Claims Management <br />9. Safety <br />10. Project Closeout <br />1. Design Management Reviews: <br />Architects and Engineers (“A/E”) <br />Coordination <br />Hensel Phelps will work with the A/E team to <br />develop project control tools that streamline <br />the process. These tools are designed to <br />clearly identify and communicate design <br />expectations, establish a design schedule <br />that includes all deliverables and supports <br />the overall project schedule, and assures <br />that the design is developed and fully <br />coordinated while addressing all technical, <br />functional and constructability issues. <br />These coordination tools are developed and <br />utilized during the procurement and design <br />phase to validate compliance with the <br />Program Criteria Document (PCD). <br />• Detailed Design Schedule. The detailed <br />design schedule will expand upon and <br />correlate with the design activities in <br />the integrated master CPM schedule. <br />This schedule will be extremely detailed <br />and organized by design phase and <br />discipline. It will include metrics which <br />enable the design progress to be <br />measured on a weekly basis. <br />• Design Submission Checklist. The <br />design submission checklist will be <br />a comprehensive list of all design <br />packages, the contents ineach <br />package and the level of development. <br />This tool, will be used to communicate <br />to the project team the level of <br />design completion required for each <br />submission. This checklist will also be <br />used by the design QC team to ensure <br />the documents are complete prior to <br />submission. <br />• Criteria Compliance Log. The criteria <br />compliance checklist is established <br />during the proposal phase and used as <br />part of the Design QC process to verify <br />compliance with the Program Criteria <br />Document (PCD).