My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Expert Center, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 15-08-01 Creation of a Cultural Master Plan
>
Responses
>
Expert Center, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2015 11:31:26 AM
Creation date
10/2/2015 11:30:12 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Create Cultural Master Plan
Bid No. (xx-xx-xx)
15-08-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HEAD OF OPERATIONS, DEPUTY MD <br />General Operations Activities: Direct all Operations activities (Pick up and Delivery), <br />Network (Domestic and Global), Fleet and Infrastructure, Security, Service Performance, <br />Procurement, Project management at country level. <br />Managerial: Managed 7 direct reports, 300+ employees and 15 different locations. <br />Cost center responsibility: Managed total operational cost of 40MM USD per year, led <br />service, quality and operational cost management improvement activities and ensured <br />the provision of a market leading service to DHL customers. <br />Project owner: Integrated 4 different sites including the head office into a newly <br />developed facility; total investment value 23MM USD. <br />JAN 2001- FEB 2005 GE - AIRCRAFT ENGINE SERVICES <br />SOURCING, LOGISTICS, INVENTORY AND CUSTOMS <br />MANAGER <br />Managed direct and indirect material purchasing of 12MM USD, P &E investments (5MM <br />USD), Transportation cost (3MM USD) and Inventory (10MM USD). <br />JAN 2000 - JAN 2001 GE - CORPORATE AUDIT STAFF -AUDITOR <br />GE Vendor Finance Services - Financial Audit - US <br />Determined high -tech IT equipments residual value of ieillion USD portfolio and analyzed <br />technology risk for new Generation IT hardware introduction. <br />GE Global Consumer Finance - Process Audit - UK <br />Improved key customers invoicing process and decrease touch points by 90 %, which led to a cost <br />saving of 90K USD. Identified 500K USD potential billing inaccuracy and implemented control <br />system around customer billing process. <br />GE Power Systems - Compliance Audit - US <br />Developed online market place for selling and buying turbine parts on the website and <br />implemented digital selling system and improved customer communication. <br />GE TIP Trailer Services - Process Audit - US <br />Maximized trailer utilization through asset management solutions; built control around all <br />maintenance and repair needs, required inspections and one -off requirements. <br />SEPT 1996 - JAN 2000 GE - TECHNICAL LEADERSHIP PROGRAM - TLP <br />PROJECT LEADER <br />1" assignment: Packaging Manager - Budapest HUN <br />2"d assignment: Manufacturing Champion - Budapest HUN <br />3rd assignment: Productivity Manager - London UK <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.