Laserfiche WebLink
City of Sunny Isles Beach 1 8070 Collins Avenue, Sunny Isles Beach, Florida 33 160 <br /> (305) 947-0606 phone (305) 949-3113 Fax <br /> 4.10 Project Representation Beyond Basic Services: <br /> (1) If the Owner and the Architect agree that more extensive representation at the site <br /> than is described in Article 3 shall be provided, the Architect shall provide one or <br /> more additional Project Representatives to assist the Architect in carrying out such <br /> responsibilities at the site. <br /> (2) Such Project Representatives shall be selected, employed and directed by the <br /> Architect shall be compensated therefore as mutually agreed between the Owner <br /> and the Architect, as set forth in an authorization under this Agreement, which shall <br /> describe the duties, responsibilities and limitations of authority of such Project <br /> Representatives. <br /> (3) Through the observations of such Project Representatives, the Architect shall report <br /> to the Owner any defects and deficiencies in the Work observed by the Architect. <br /> 4.11 Services of special consultants, for other than the normal structural, mechanical and <br /> electrical engineering services, and services of estimators making detailed cost estimates. <br /> 4.12 Additional services in connection with the Project not otherwise provided for in this <br /> Agreement. <br /> ARTICLE 5 <br /> TIME <br /> 5.1 The Architect shall perform Basic and Additional Services as expeditiously as is consistent <br /> with professional skill and care and the orderly progress of the Project. The schematic <br /> design documents, specifications, and construction documents shall be completed within <br /> 40 (Forty) weeks of execution of this Agreement, as detailed in Architect's response to <br /> Request for Qualifications ("RFQ") No. 15-04-01, consisting of four (4) pages and <br /> identified as Exhibit "G". <br /> 5.2 The Architect shall not be liable for failure to perform the contract or meet any schedule of <br /> performance of services to the extent that any delay or impediment arises from causes <br /> beyond the control and without the fault or negligence of the Architect. Examples of such <br /> causes include acts of God or of the public enemy, acts of the Owner or third parties, fires, <br /> floods, pandemics or epidemics, quarantine restrictions, strikes or labor actions, boycotts, <br /> freight embargoes, and unusually severe weather. If the failure to perform is caused by the <br /> default of one or more of Architect's subconsultants at any tier, and if the cause of the <br /> i <br /> C1415- PERKINS& WILL ARCHITECTS INC. 12 ;-j l L <br />