My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2459
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2459
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 11:42:01 AM
Creation date
10/12/2015 4:21:53 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2459
Date (mm/dd/yyyy)
09/17/2015
Description
Ratify Agmt w/ Perkins+Will for Arch. Design Srvcs for a New BLDG at 18080 Collins
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERKINS+WILL <br /> TEAM ORGANIZATION <br /> Lawrence Kline will serve as the Design Principal with Jackie Candela as Project Manager / Project Architect and <br /> Carlos Vilato as the Senior Designer providing daily oversight and management of the project throughout service <br /> delivery. In addition, Pat Bosch as Design Director of the Miami Office will provide critical design peer review and <br /> critique during the design process and George Valcarcel will provide Quality Review and peer review of the construction <br /> documents. <br /> MEETING SCHEDULE . <br /> Based on the proposed design schedule described above, we have assumed the following maximum number of <br /> meetings and presentations calculated into our fee: <br /> Programming Verification + Stakeholder Meetings 2 meetings with City Staff and Stakeholders <br /> Schematic Design 2 Meetings with the City, 1,Commission Presentation <br /> Client Review and Approval of Design and Cost 1 Meeting with the City <br /> Design Development 2 Meetings with the City, 1 Commission Presentation <br /> Client Review and Approval of Design and Cost 1 Meeting with the City <br /> Construction Documents 2 Meetings with the City, 1 Commission Presentation <br /> Review and Approval of Design and Cost(final before permit) 1 Meeting with the City <br /> BUDGET <br /> We understand that the project budget is evolving as the detailed program areas and parking requirements are finalized <br /> based on the eventual mix of Academic, Civic, Office,Wellness and Retail uses.We would recommend that the City <br /> of Sunny Isles Beach engage a Construction Manager to work with the design architect from the start of the process; <br /> the current robust construction market has resulted in rising construction costs and we viant to ensure that with the <br /> help of a CM, we can establish and maintain a construction cost within budget for this project from Schematic Design <br /> through to the completion of Construction Documents. <br /> FEES AND EXPENSES <br /> Perkins+Will proposes to provide the services as outlined herein in a sequenced fashion. <br /> The proposed fees by phase include: <br /> Architecture and Interior Design Fee <br /> Program Verification $22,500 <br /> Schematic Design $207,000 <br /> Design Development $208,500 <br /> Construction Documents $295,000 <br /> Bidding + Permitting $49,500 <br /> Construction Administration $506,500 <br /> Furniture Selection for Civic Spaces $30,500 <br /> Engineering and Landscape Consultants Fee <br /> Mechanical, Electrical, Plumbing Engineering $430,000 <br /> Separate Electric Metering for Office(3), School(1), Civic(1) $15,000 <br /> Structural Engineering $180,000 <br /> Threshold Inspections $80,000 <br /> Civil Engineering 555,000 <br /> Landscape Architecture $105,000 <br /> Green Roof Over School/Additional Site Features $37,500 <br /> The above-described professional fees are for base building Architecture, Interiors,Engineering and Landscape design <br /> services and do not include any additional consultant services.Additional consultants requested by the City of Sunny <br /> Isles Beach may include specialties such as specialty kitchen (warming kitchen for the School and Senior Center are <br /> included in the above fee),specialty acoustical,specialty lighting,specialty audio-visual,etc.Perkins+Will can provide <br /> these additional consultant services and associated fee proposals as an addition to this base contract amount. In <br /> addition, the Interior Design services are for core and shell design and will include finishes and lighting design for all <br /> core and shell surfaces and furniture selection and specification for the Civic and Main Lobby areas. In addition, the <br /> architectural and engineering fees quoted above provide for base core and shell scope andiwe have excluded fees in <br /> our proposal for LEED Certification. <br /> perkins'wlll.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.