SAMSON OCEANFRONT PARK <br />CITY OF SUNNY ISLES <br />TECHNICAL SPECIFICATIONS <br />IRRIGATION 02810-8 <br />and fill lines with water. Pressurize assembly to 100 P.S.I. and shut off pump. System shall hold at <br />100 P.S.I. for one hour at no loss of pressure. Joints, tees, elbows, caps and connections shall be left <br />uncovered during this test. Main line sections of solid unbroken pipe should be buried at intervals <br />adequate to secure stabilization of pipe runs when pressurized. If necessary, repair leaks and re-test <br />assembly until satisfactory. Install sprinkler heads after approval of test results. <br /> <br /> C. Final inspection shall be made when the complete system is in place, operable, and all repairs, <br />additions, adjustments, and other work is complete. At such time, the Contractor shall adequately <br />demonstrate the proper operation of the system, shall show the system's complete conformance with <br />the plans and specifications, and demonstrate that the irrigation system gives proper and adequate <br />coverage of all landscaped areas. <br /> <br />D. Acceptance by the Architect and/or Owner in no way removes the Contractor of his/her <br />responsibility to make further repairs, corrections and adjustments to eliminate any deficiencies <br />which may later be discovered. Moreover, the Contractor shall fully honor the one-year warranty <br />outlined herein. <br /> <br />END OF SECTION