Laserfiche WebLink
SAMSON OCEANFRONT PARK <br />CITY OF SUNNY ISLES <br />TECHNICAL SPECIFICATIONS <br /> <br /> <br />SUMMARY OF WORK 01010-2 <br /> B. Contractor may suggest modifications to the sequence provided the access and operation requirements are <br />satisfied and compliance with the overall contract period is achieved. <br /> <br />C. Scheduled Events: Schedule the Work to conform to the following events and dates, and to provide for <br />coordination with the work performed by others. No events are scheduled. <br /> <br />1.08 COPIES OF DOCUMENTS <br /> <br />: See 01300 Submittals. <br />1.09 LIST OF DRAWINGS <br /> <br />: <br />A. Contract Drawings: <br />Samson Oceanfront Park <br />Civil: <br />1. Cover <br />2. Topographic Survey <br />3. Topographic Survey <br />4. General Notes <br />5. General Notes <br />6. Demolition Plan <br />7. Sanitary Sewer Plan <br />8. Sanitary Sewer Profile <br />9. Sanitary Sewer Details <br />10. Sanitary Sewer Details <br />11. Lift Station Details <br />12. Geometry Plan <br />13. Grading Plan <br />14. Civil Details <br />15. Water Details <br />16. Signing and Pavement Marking Plans <br />17. Temporary Traffic Control Notes <br />18. Stormwater Pollution Prevention Plan <br /> <br />Architectural: <br />1. Stage Plans <br />2. Small Playground Plans <br />3. Large Playground Floor Plans <br />4. Large Playground Roof Plans <br />5. Proposed Demolition Plan <br />6. Proposed Floor Plan <br />7. Elevations <br />8. Bathroom Interior Elevations <br /> <br />Structural: <br />1. General Structural Notes <br />2. Boardwalk Framing Plan and Details <br />3. Entry Wall Plan and Details <br />4. Smart Play Motion Structure <br />5. Play Booster Structure <br />6. Stage Structure <br />7. Structural Schedules and Details <br />