My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment A - 2015-3-13_Samson Park Technical Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Attachment A - 2015-3-13_Samson Park Technical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 10:00:19 AM
Creation date
11/12/2015 9:46:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMSON OCEANFRONT PARK <br />CITY OF SUNNY ISLES <br />TECHNICAL SPECIFICATIONS <br /> <br />CONCRETE REPAIRS 03732-5 <br />A. Inject adhesive into prepared ports under pressure using equipment appropriate for particular <br />application. <br />B. Begin injection at port located at one end of crack and continue until adhesive appears in adjacent <br />entry port. Continue from port to port until entire crack is filled. <br /> <br />C. Remove temporary seal, entry ports and excess adhesive. Grind surface smooth. <br /> <br />D. Clean surfaces adjacent to repair and blend finish. <br /> <br />3.07 APPLICATION -CEMENTITIOUS MORTAR: <br /> <br /> <br />A. Apply scrub coat of neat mortar to SSD concrete surfaces. Provide full surface coverage. <br /> <br />B. Apply cementitious mortar by steel trowel to an average thickness of one inch. Tamp into place <br />filling voids at spalled areas. Work mix into honeycomb. Apply additional lifts as necessary. <br /> <br />C. Alternately, install forms and place cementitious mortar by pouring. Vibrate as necessary to <br />consolidate. <br /> <br />D. Damp cure cementitious mortar for four days or as per manufacturer's instructions. Alternatively, <br />apply curing compound in accordance with manufacturer's instructions. <br /> <br />3.08 FIELD QUALITY CONTROL: <br /> <br /> <br />A. Section 01400- Quality Control: Field inspection. <br /> <br />3.09 SCHEDULE <br /> <br />: <br />A. Concrete Member Spalls: Cementitious mortar with smooth trowel finish. Apply <br />painted stucco finish to match adjacent surfaces. <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.