My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment A - 2015-3-13_Samson Park Technical Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Attachment A - 2015-3-13_Samson Park Technical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 10:00:19 AM
Creation date
11/12/2015 9:46:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMSON OCEANFRONT PARK <br />CITY OF SUNNY ISLES <br />TECHNICAL SPECIFICATIONS <br />CONCRETE REPAIR MORTARS 033123-3 <br /> <br />Dampen substrate to fill concrete pores with water. Remove ponding, glistening, or surface water (saturated surface <br />dry). <br />Apply scrub coat of repair mortar into substrate to ensure intimate contact and establish bond. <br />Apply mortar while scrub coat is wet. Consolidate and trowel to the desired finish, with a minimum thickness of 1/4 <br />inch. <br />For application depths greater than 2 inches, apply in successive lifts, per manufacturer’s instructions. <br />Apply first lift and scratch surface to promote mechanical bond to subsequent lifts. <br />Apply second lift as soon as initial lift has hardened sufficiently to receive additional material. A scrub coat is not <br />required between successive lifts. <br />If more than three lifts of material are required, allow at least 24 hours of curing between each third lift and the next <br />application. <br />Curing <br />Keep surface damp for 48 hours with continuous light water-fogging. <br />If no coating or sealer is to be applied, a water-based curing compound meeting ASTM standard C309 may be used. <br />Do not use solvent-based curing compounds. <br />Cleaning: Remove excess material before material cures. If material has cured, remove using mechanical methods <br />which will not damage substrate. <br /> <br />END OF SECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.