My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment A - 2015-3-13_Samson Park Technical Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Attachment A - 2015-3-13_Samson Park Technical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 10:00:19 AM
Creation date
11/12/2015 9:46:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMSON OCEANFRONT PARK <br />CITY OF SUNNY ISLES <br />TECHNICAL SPECIFICATIONS <br /> <br />SUBMITTALS 013 00-2 <br /> <br />necessary to meet such requirements. Contractor's (or his Subcontractor's) failure to initially <br />satisfy the legibility quality requirements will not relieve Contractor (or his Subcontractors) <br />from meeting the required schedule for Submittal of shop drawings and product data. <br /> <br />C. Language and Dimensions: <br /> 1. All words and dimensional units shall be in the English language. <br /> 2. Metric dimensional unit equivalents may be stated in addition to the English units. <br /> <br />D. Submittal Completeness: <br /> 1. Submittals shall be complete with respect to dimensions, design criteria, materials of <br />construction, and other information specified to enable Design Engineer to review the <br />information effectively. <br /> 2. Where standard drawings are furnished which cover a number of variations of the general <br />class of equipment, each such drawing shall be individually annotated to describe exactly <br />which parts of the drawing apply to the equipment being furnished. Use hatch marks to <br />indicate variations that do not apply to the Submittal. The use of "highlighting markers" is not <br />an acceptable means of annotating Submittals. Such annotation shall also include proper <br />identification of the Submittal permanently attached to the drawing. <br /> 3. Reproduction or copies of Contract Drawings or portions thereof will not be accepted as <br />complete fabrication or erection drawings. The Contractor may use a reproduction of the <br />Design Engineer prepared Contract Drawings for erection drawings such as to indicate <br />information on erection or to identify detail drawing references. Where the drawings are <br />revised to show this additional Contractor information, the Design Engineer's title block shall <br />be replaced with a Contractor's title block and the Design Engineer's professional seal shall be <br />removed from the drawing. The Contractor shall revise these erection drawings for <br />subsequent Design Engineer revisions to the Contract Drawings. <br /> <br />1.03 COMPLIANCE SUBMITTALS <br />A. Items shall include, but not be limited to, the following: <br />: <br /> 1. Manufacturer's specifications. <br /> 2. Catalogs, or parts thereof, of manufactured equipment. <br /> 3. Shop fabrication and erection drawings. <br /> 4. General outline drawings of equipment showing overall dimensions, location of major <br />components, weights, and location of required building openings and floor plates. <br /> 5. Detailed equipment installation drawings, showing foundation details, anchor bolt sizes and <br />locations, baseplate sizes, location of City's connections; and all clearances required for <br />erection, operation, and disassembly for maintenance. <br /> 6. Schematic diagrams for electrical items, showing external connections, terminal block <br />numbers, internal wiring diagrams, and one-line diagrams. <br /> 7. Bills of material and spare parts list. <br /> 8. Instruction books and operating manuals. <br /> 9. Material lists or schedules. <br /> 10. Performance tests on equipment by manufacturers. <br /> 11. Concrete mix design information. <br /> 12. Samples and color charts. <br /> 13. All drawings, catalogs or parts thereof, manufacturer's specifications and data, samples, <br />instructions, and other information specified or necessary: <br />a. For Design Engineer to determine that the Equipment and Materials conform with the <br />design concept and comply with the intent of the Contract Documents. <br />b. For the proper erection, installation, operation and maintenance of the Equipment and <br />Materials which Design Engineer will review for general content but not for substance. <br />c. For Design Engineer to determine what supports, anchorages, structural details, <br />connections, and services are required for the Equipment and Materials, and the effects on <br />contiguous or related structures and Equipment and Materials. <br /> 14. As-built drawings.
The URL can be used to link to this page
Your browser does not support the video tag.