My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment A - 2015-3-13_Samson Park Technical Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Attachment A - 2015-3-13_Samson Park Technical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 10:00:19 AM
Creation date
11/12/2015 9:46:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMSON OCEANFRONT PARK <br />CITY OF SUNNY ISLES <br />TECHNICAL SPECIFICATIONS <br /> <br />SUBMITTALS 013 00-3 <br /> <br /> <br />B. Schedule and Log of Compliance Submittals: <br /> 1. Prepare for Design Engineer, a schedule and log for submission of all Compliance Submittals <br />specified or necessary for Design Engineer's review of the use of Equipment and Materials <br />proposed for incorporation in the Work or needed for proper installation, operation or <br />maintenance. Submit the schedule and log with the procurement schedule and Work progress <br />schedule. Schedule submission of all Compliance Submittals to permit review, fabrication and <br />delivery in time so as to not cause a delay in the Work of Contractor or his Subcontractors or <br />any other contractors as described herein. <br /> 2. In establishing schedule for Compliance Submittals allow 15 days in Design Engineer's office <br />for reviewing original Submittals and 10 days for reviewing resubmittals. <br /> 3. The schedule shall indicate the anticipated dates of original submission, and shall be based <br />upon at least one resubmission of each item. <br /> 4. Schedule all Compliance Submittals required prior to fabrication or manufacture for <br />submission within 90 days of the Notice to Proceed. Schedule Compliance Submittals <br />pertaining to storage, installation and operation at the site for Engineer's acceptance prior to <br />delivery of the Equipment and Materials. <br /> 5. Resubmit Compliance Submittals the number of times required for Design Engineer's <br />"Submittal Accepted." However, any need for resubmittals in excess of the number set forth <br />in the accepted schedule, or any other delay in obtaining acceptance of Submittals, will not be <br />grounds for extension of the Contract Time, provided Design Engineer completes his reviews <br />within the times stated above. <br /> <br />C. Transmittal of Compliance Submittals: <br />1. All Compliance Submittals of Equipment and Materials furnished by Subcontractors, <br />manufacturers, and Suppliers shall be submitted to the City by Contractor <br />2. After checking and verifying all field measurements, transmit all Compliance Submittals to the <br />City for acceptance as follows: <br /> a. Affix a Compliance Submittal Information Block to all compliance submittals whether <br />prepared by Contractor, Subcontractor, or Supplier. Affix decals on all shop drawings, and <br />gummed paper- type blocks on all product data type Submittals. All Compliance Submittal <br />Information Blocks needed for Project will be furnished to Contractor at no charge at the <br />initial coordination conference. A copy of the Compliance Submittal Information Block is <br />attached to this Section. <br /> b. Identify each Compliance Submittal by Submittal Number, Project name and number, <br />Contract title and number, and the Specification Section and article number marked thereon or <br />in the letter of transmittal. Unidentifiable Submittals will be returned for proper <br />identification. <br /> c. Check and stamp Compliance Submittals of Subcontractors, Suppliers, and manufacturers <br />with Contractor's approval prior to transmitting them to the City. Contractor's stamp of <br />approval shall constitute a representation to City and Design Engineer that Contractor has <br />either determined and verified all quantities, dimensions, field construction criteria, materials, <br />catalog numbers, and similar data, or he assumes full responsibility for doing so, and that he <br />has coordinated each Compliance Submittal with the requirements of the Work and the <br />Contract Documents. <br /> d. At the time of each submission, call to the attention of Design Engineer in the letter of <br />transmittal any deviations from the requirements of the Contract Documents. <br /> e. Make all modifications noted or indicated by Design Engineer and return revised prints, <br />copies, or samples until accepted. Direct specific attention in writing, or on revised <br />Submittals, to changes other than the modifications called for by Design Engineer on previous <br />Submittals. After Submittals have been accepted, submit copies thereof for final distribution. <br />Prints of accepted drawings transmitted for final distribution will not be further reviewed and <br />are not to be revised. If errors are discovered during manufacture or fabrication, correct the <br />Submittal and resubmit for review.
The URL can be used to link to this page
Your browser does not support the video tag.