My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment A - 2015-3-13_Samson Park Technical Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Attachment A - 2015-3-13_Samson Park Technical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 10:00:19 AM
Creation date
11/12/2015 9:46:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMSON OCEANFRONT PARK <br />CITY OF SUNNY ISLES <br />TECHNICAL SPECIFICATIONS <br />CONTRACT CLOSEOUT 01700 -1 <br />SECTION 01700 CONTRACT CLOSEOUT <br /> <br />PART 1 - GENERAL <br /> <br />1.01 SUMMARY <br /> <br />: <br /> A. This Section includes administrative and procedural requirements for contract closeout including, but not <br />limited to, the following: <br /> 1. Inspection procedures. <br /> 2. Project record document submittal. <br /> 3. Operation and maintenance manual submittal. <br /> 4. Submittal of warranties. <br /> 5. Final cleaning. <br /> 6. Contractor's Certification. <br /> <br /> B. Closeout requirements for specific construction activities are included in the appropriate Sections in <br />DIVISIONS 2 through 16. <br /> <br /> C. Related Work Specified Elsewhere: <br /> 1. Definitions of Substantial Completion and Final Completion: As defined in the General Terms and <br />Conditions. <br /> 2. Submittals: SECTION 01300. <br /> <br />1.02 SUBSTANTIAL COMPLETION <br /> <br />: <br />A. Preliminary Procedures: Before requesting inspection for certification of Substantial Completion, complete <br />the following: <br /> <br />1. Submit specific warranties, workmanship bonds, maintenance agreements, final certifications, and <br />similar documents. <br /> 2. Obtain and submit releases enabling the City unrestricted use of the Work and access to services and <br />utilities. Include operating certificates, and similar releases. <br /> 3. Submit record drawings, maintenance manuals, Project photographs, damage or settlement surveys, <br />property surveys, and similar record information. <br /> 4. Deliver tools, spare parts, extra stock, and similar items. <br /> 5. Make changeover of permanent locks and transmit keys to the City. <br />6. Complete start-up testing of systems and instruction of the City's operation and maintenance <br />personnel. <br /> 7. Discontinue and remove temporary facilities from the site, along with mockups, construction tools, <br />and similar elements. <br /> 8. Complete final cleanup requirements, including touch up painting. <br /> 9. Touch up and otherwise repair and restore marred, exposed finishes. <br /> <br /> B. Inspection Procedures: On receipt of a request for inspection, the City will either proceed with inspection <br />or advise the Contractor of unfilled requirements. The City will prepare the Certificate of Substantial <br />Completion following inspection or advise the Contractor of work that must be completed or corrected <br />before the certificate will be issued. <br /> <br /> 1. The City will reschedule the inspection when in its opinion, the Work is substantially complete. <br /> <br />1.03 FINAL ACCEPTANCE <br /> <br />: <br /> A. Preliminary Procedures: Submit certification by Contractor that Work has been completed in accordance <br />with the Contract Documents to the knowledge of the Contractor. Before requesting final inspection,
The URL can be used to link to this page
Your browser does not support the video tag.