My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment A - 2015-3-13_Samson Park Technical Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Attachment A - 2015-3-13_Samson Park Technical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 10:00:19 AM
Creation date
11/12/2015 9:46:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMSON OCEANFRONT PARK <br />CITY OF SUNNY ISLES <br />TECHNICAL SPECIFICATIONS <br />DEMOLITION 02050-1 <br /> <br />SECTION 02050 - DEMOLITION <br /> <br /> <br />PART 1 - GENERAL <br /> <br />1.01 <br /> <br />SCOPE: <br />A. Summary of Work: The CONTRACTOR shall include the removal of existing construction to limits <br />indicated on drawings where earthwork or other construction operations are to be performed as <br />specified herein. The ENGINEER shall not be responsible for the condition of any items to be <br />removed or salvaged. <br /> <br />B. RELATED WORK: <br />1. SITE PREPARATION: Section 02100. <br />2. CLEARING and LAND PREPARATION: Section 02110. <br /> <br />1.02 <br /> <br />APPLICABLE PUBLICATIONS: (Not Used) <br />1.03 <br /> <br />DEFINITIONS: (Not Used) <br />1.04 <br /> <br />SUBMITTALS: <br />A. Schedule of Demolition: <br />1. Submit proposed methods and operations of demolition for review prior to the start of work. <br /> <br />B. Permits: <br />1. The CONTRACTOR shall be responsible for acquiring appropriate necessary permits for the <br />wo rk. Copies of the permits shall be submitted to the ENGINEER. <br /> <br />1.05 QUALIFICATIONS: <br /> <br /> Employ experienced workers in the specified work ares. <br />1.06 <br /> <br />RESPONSIBILITIES: <br />A. The CONTRACTOR shall not commence demolition of structure(s) prior written permission of the <br />ENGINEER. <br /> <br />C. Condition of structures to be demolished: <br />1. The City assumes no responsibility for actual condition of structures to be demolished. <br />2. Conditions existing at time of inspection for bidding purposes will be maintained by City <br />insofar as practicable. <br /> <br />C. The CONTRACTOR shall remove all such foundations to one foot below the proposed sub-grades. <br /> <br />D. Explosives: The use of explosives will not be permitted. The CONTRACTOR may use a non- <br />explosive, expanding agent in drilled holes for the demolition of concrete, and shall conform to all <br />manufacturers’ recommendations, including safety precautions for mixing and placing the agent. <br /> <br />E. The CONTRACTOR shall ensure the safe passage of persons around the area of demolition and <br />clearing. The CONTRACTOR shall conduct operations to prevent injury to adjacent structures, other <br />facilities, and persons. <br />1. The CONTRACTOR shall protect existing finish work that is to remain in place from <br />damage due to demolition operations. <br /> <br />F. Traffic:
The URL can be used to link to this page
Your browser does not support the video tag.