Laserfiche WebLink
Samson Oceanfront Park <br />City of Sunny Isles <br />Technical Specifications <br />SOIL STABILIZATION 02240-2 <br /> <br /> <br /> <br /> <br /> <br />A. General Requirements: The CONTRACTOR shall provide the required stabilization material which <br />shall be either commercial limerock or crushed shellrock in conformance with FDOT Standard <br />Specifications for Road and Bridge Construction SECTION 914-2, Stabilization. <br /> <br />PART 3 - EXECUTION <br /> <br />3.01 PREPARATION: <br /> <br /> The CONTRACTOR shall prior to the beginning of the stabilizing operations, grade the area <br />to be stabilized to an elevation such that upon completion of the stabilizing operations the stabilized subgrade <br />will conform to the lines, grades and cross sections shown on the Drawings. <br />3.02 APPLICATION OF STABILIZING MATERIAL: <br /> <br /> The CONTRACTOR shall spread the stabilizing material <br />uniformly over the area to be stabilized. The CONTRACTOR shall then mix the material with rotary tillers, or <br />other equipment meeting the approval of the ENGINEER. The area to be stabilized shall be thoroughly mixed <br />throughout the entire depth and width of the stabilizing area. <br />3.03 COMPACTION: <br /> <br /> After mixing operations are completed, the CONTRACTOR shall compact the area to the <br />minimum density as required by FDOT SECTION 160-4.2.3. The subgrade shall be firm and unyielding; to <br />the extent that it will support construction equipment. The CONTRACTOR shall remove all soft and yielding <br />material, and any other portions of the subgrade, which will not compact readily, and replace with suitable <br />material and the whole subgrade brought to line and grade. <br />3.04 FINISH GRADING: <br /> <br /> The CONTRACTOR shall shape the completed stabilized subgrade to conform to the <br />finished lines, grades, and cross-sections indicated on the Drawings. <br />3.05 MAINTENANCE: <br /> <br /> After the subgrade has been completed as specified, the CONTRACTOR shall maintain it <br />free from, ruts, depressions and any damage resulting from the hauling or handling of materials, equipment, etc. <br />It shall be the CONTRACTOR's responsibility to maintain the required density until the subsequent base is in <br />place. <br />END OF SECTION