My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment B - Report of Geotechnical Exploration Samson Oceanfront Park Revised
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Attachment B - Report of Geotechnical Exploration Samson Oceanfront Park Revised
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 10:29:14 AM
Creation date
11/12/2015 10:28:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Report of Geotechnical Exploration November 7, 2014 <br />Samson Oceanfront Park AREHNA Project B-14-124 <br /> <br /> <br />6 | Page <br />5.0 DESIGN RECOMMENDATIONS <br /> <br /> 5.1 General <br /> <br />Our geotechnical evaluation is based upon the previously presented project information as well as the field <br />data obtained during this geotechnical exploration. If final structure or foundation loads are significantly <br />different from those described or if the subsurface conditions during construction are different from those <br />revealed by our boring, we should be notified immediately so that we might review our recommendations <br />presented in this report. Our recommended site preparation is presented in Section 6.0, General Site <br />Preparation. <br /> <br />5.2 Auger Cast Piles <br /> <br />The proposed stage and playground roof structure should be constructed on 14-inch auger cast piles. We <br />recommend the piles be installed to a depth of 35 feet below the existing ground surface. An allowable axial <br />compression capacity of 35 kips and an allowable axial tension capacity of 20 kips can be used for design. <br /> <br />Installing auger cast piles requires equipment consisting of a mobile base carrier fitted with a hollow-stem <br />flight auger. The auger is drilled into the ground to the desired depth and then grout is pumped through <br />the auger as it is extracted. A continuous flow of fluid should be observed at the ground surface during <br />grouting. Reinforcement is placed after the pile is grouted. <br /> <br />We recommend a load test be performed on a non-production pile to evaluate the performance of the pile <br />installation equipment and to confirm the design allowable pile capacity. The test should be performed <br />on a non-production pile test loaded to a minimum of two times the allowable compressive design <br />capacity or to failure. Installation of production piles may proceed upon successful completion of the <br />load test. Installation should be monitored by a geotechnical engineer or engineering technician working <br />under the direction of a geotechnical engineer. <br /> <br />5.3 Settlement <br /> <br />Settlement of pile supported structural elements should be small and tolerable for a typical foundation <br />configuration. Based on the subsurface soil conditions encountered in the soil borings performed for this <br />report and our past experience with similar soil conditions, we do not anticipate significant downdrag <br />loads acting on the piles. <br /> <br />5.3 Floor Slab Design <br /> <br />It is expected that the floor slab of the stage will be supported on compacted existing soils or structural fill. If <br />site preparation is performed in accordance with the recommendations presented in this report, the modulus <br />of vertical subgrade reaction (k) for the slab bearing soils is expected to be on the order of 150 pounds per <br />square inch per inch of vertical deflection (pci). Our evaluation was based on satisfactory performance of our
The URL can be used to link to this page
Your browser does not support the video tag.