My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment B - Report of Geotechnical Exploration Samson Oceanfront Park Revised
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Attachment B - Report of Geotechnical Exploration Samson Oceanfront Park Revised
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 10:29:14 AM
Creation date
11/12/2015 10:28:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Report of Geotechnical Exploration November 7, 2014 <br />Samson Oceanfront Park AREHNA Project B-14-124 <br /> <br /> <br />7 | Page <br />recommended approach with other structures and similar soil conditions. The subgrade soils should be <br />compacted to a minimum of 98 percent of the Modified Proctor maximum dry density (ASTM D-1557). <br /> <br />A vapor retarder is required by the Florida Building Code in air conditioned spaces: Where installed <br />beneath the slab, dampproofing shall consist of not less than 6-mil [0.006 inch; (0.152 mm)] polyethylene <br />with joints lapped not less than 6 inches (152 mm), or other approved methods or materials. We recommend <br />the vapor retarder be at least 15-mil in thickness and conform to the requirements of ASTM E 1745, Class A. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.