My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment B - Report of Geotechnical Exploration Samson Oceanfront Park Revised
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Attachment B - Report of Geotechnical Exploration Samson Oceanfront Park Revised
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 10:29:14 AM
Creation date
11/12/2015 10:28:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Report of Geotechnical Exploration November 7, 2014 <br />Samson Oceanfront Park AREHNA Project B-14-124 <br /> <br /> <br />8 | Page <br />6.0 GENERAL SITE PREPARATION <br /> <br />6.1 General <br /> <br />The initial step in site preparation should be the complete removal of all existing vegetation, topsoil, root <br />systems, debris, and other deleterious materials from beneath and to a minimum of five feet beyond the <br />development perimeter. Also, prior to construction, the location of any existing foundations, underground <br />irrigation, septic tanks, drainage, or other utility lines within the construction area should be established. <br />In this regard it should be noted that if underground pipes are not properly removed or plugged, they may <br />serve as conduits for subsurface erosion which subsequently may result in excessive settlements. The <br />structure areas should then be inspected and thoroughly proofrolled as directed by a Geotechnical <br />Engineer. Our recommendations listed in this section should be used as a guideline for the project general <br />specifications prepared by the Design Engineer: <br /> <br /> The entire site should be proofrolled with a large vibratory roller with a 4 foot <br />diameter drum and a static weight of at least 8 tons. At least 8 complete coverages (4 <br />in each perpendicular direction) should be performed over the entire stage and <br />playground areas prior to raising site grades. Careful observations should be made <br />during proofrolling to help identify any areas of soft-yielding soils that may require <br />over excavation and replacement. Careful observations should further be made to the <br />adjacent buildings during proofrolling operations. <br /> Following satisfactory completion of proofrolling, additional fill should be placed <br />and compacted as needed to achieve the desired grades. Fill should generally consist <br />of dry fine sand with less than 12 percent passing the No. 200 sieve and be free of <br />rubble, organics, clay, debris and other unsuitable material. Fill should be tested and <br />approved prior to acquisition. <br /> Approved sand fill should be placed in loose lifts not exceeding 12 inches in <br />thickness and should be compacted to a minimum of 95 percent of the Modified <br />Proctor maximum dry density (ASTM D-1557). Foundation bearing soils should be <br />compacted to a minimum of 95 percent of the Modified Proctor maximum dry <br />density (ASTM D-1557). Density tests to confirm compaction should be performed <br />in each fill lift before the next lift is placed. <br /> Prior to beginning compaction, soil moisture contents should be adjusted in order to <br />facilitate proper compaction. A moisture content within 2 percentage points of the <br />optimum indicated by the Modified Proctor Test (ASTM D-1557) is recommended <br />prior to compaction of the natural ground and fill. <br /> Immediately prior to reinforcing steel placement, it is suggested that the bearing <br />surfaces of all floor slab areas be compacted using hand-operated mechanical <br />tampers. In this manner, any localized areas which have been loosened by <br />excavation operations should be adequately re-compacted.
The URL can be used to link to this page
Your browser does not support the video tag.