My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment B - Report of Geotechnical Exploration Samson Oceanfront Park Revised
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Attachment B - Report of Geotechnical Exploration Samson Oceanfront Park Revised
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 10:29:14 AM
Creation date
11/12/2015 10:28:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Report of Geotechnical Exploration November 7, 2014 <br />Samson Oceanfront Park AREHNA Project B-14-124 <br /> <br /> <br />9 | Page <br /> A materials testing laboratory should be retained to provide on-site observation of <br />earthwork and ground modification activities. Density tests should be performed in <br />the top one foot of compacted existing ground, in each fill lift, and at the bottom of <br />foundation excavations and in each foot of backfill. <br />6.2 Ground Water Control <br /> <br />Depending upon the seasonal conditions, runoff from adjoined sites and pavements may cause significant <br />surface water until drainage structures are emplaced. Soils exposed in the bases of all satisfactory <br />foundation excavations should be protected against any detrimental change in conditions, such as physical <br />disturbance or rain. Surface run-off water should be drained away from the excavations and not be <br />allowed to pond. <br /> <br />6.3 On-Site Soil Suitability <br /> <br />Suitable structural fill materials should consist of fine to medium sand with less than 12 percent passing the <br />No. 200 sieve and be free of rubble, organics, clay, debris and other unsuitable material. The upper fine <br />sand (SP) found in the borings is considered suitable for structural fill. Any off-site materials used as fill <br />should be approved by AREHNA prior to acquisition. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.