Laserfiche WebLink
R.l.Behar & Company, Inc. <br /> Engineers • Planner s <br /> V. MEP SERVICES: <br /> The MEP subconsultants will produce construction documents and . drawing; <br /> specifications for lighting upgrades in vending area and restrooms and new electrical: <br /> service for obtaining 3 phase power drop into site. The services shall include the' <br /> following: <br /> 1. Two (2) Coordination meetings with Client and City of Sunny Isles Beach to <br /> establish the design criteria for electrical and site lighting. <br /> 2. Construction documents and specifications for electrical and site lighting, which, <br /> include, but are not limited to, floor plans, schedules, risers,panels, details, etc. <br /> 3. Coordinate and conform to the applicable Building Codes and building departments. i <br /> 4. Three (3) sets of signed and sealed permit documents. Additional sets to be billed as <br /> reimbursable. <br /> 5. Progress/Coordination meetings with Client/Owner for design. <br /> 6. Light fixture selection and placement is included. <br /> VI.ENVIRONMENTAL PERMITTING: <br /> Task 1 —Vegetation and Habitat Assessment <br /> This task includes a desktop review of potentially regulated resources and conducting a <br /> site assessment to document the presence/locations of vegetative communities within the <br /> project area, including beach dune, coastal strand, hammock, wetland and exotic; <br /> vegetation. E Sciences will assess the potential for impacts to sea turtles due to existing <br /> and proposed lighting and changes to the park's landscaping. Findings will be prepared in j <br /> a memorandum for use in permitting, along with a figure depicting vegetative <br /> communities or habitat. <br /> Task 2 —Plans Review and Comments <br /> E Sciences will review the proposed plans and comment on aspects that we identify as <br /> unlikely to be in compliance with FDEP and FWC guidelines, as well as Chapter 108,: <br /> Article III of the City of Sunny Isles Beach Code of Ordinances. If requested, E Sciences <br /> will red line the plans and suggest modifications. Recommendations may include <br /> lighting options that have been preapproved by the FWC as sea turtle friendly. <br /> Task 3—Permitting and Agency Coordination <br /> E Sciences will complete the permit applications and prepare the permit application <br /> packages with information provided by the survey/design team. Information that will) <br /> need to be provided to E Sciences includes: <br /> 1. Ownership documentation, <br /> 2. Evidence that the project does not contravene local setback requirements and zoning <br /> codes, <br /> Work Order Proposal Samson Oceanfront Park Services \;� k9;:1 <br /> City of Sunny Isles Beach Page 4 of 6 `'"s '",,: <br />