Laserfiche WebLink
- . <br /> f. ITrooks:rtrailets:.(for.reitifording steel deliveries)- <br /> _ . <br /> g: -Generators • <br /> : . <br /> 4. Temporary shoring and excavation: <br /> a; --CraneS:(CraWler:and hydraulic) <br /> b. <br /> c -Pjlel:driVing.eddiprnent <br /> d. COnCfetetuCkS <br /> e. <br /> Backhoes/Excavators <br /> g. Lbadefs/D64erS <br /> h- Dump Trucks <br /> C6ftipaetion-eduiPirsent • - <br /> j. Dewatering pumps (diesel and electric) <br /> k. Generators <br /> 5. Mat founclati051.:POpariation...and,.c.QOP,IP@PQgr: <br /> a. Cranes (tower, craWier, and hydraulic) <br /> b. Backhoes/Loaders <br /> c. Purnps.(?oth for dewatering and:concrete) <br /> d. Trucks (dump trucks, Condete.trdCkS,-ecidipment trucks, etc.) <br /> e. Trailers <br /> f. Concrete finishing equipm ent <br /> 6. Tower Crane and Man/Material H6ist EreCtion, Jumps, and Dismantling: <br /> a. Large crawler and hydraulic cranes (for tower crane and man/material <br /> hoist assembly and erection) <br /> b. Tower cranes (for tower crane and man/material hoist jumping) <br /> c. Large crawler and hydraulic cranes (for tower crane and man/material <br /> hoist dismantling) <br /> d. Generators <br /> e. Tractor trailers- <br /> 7. Other concrete placement activities: <br /> a. Cranes (tower, crawler, and hydraulic) <br /> b. Concrete pumps <br /> c. Concrete trucks <br /> d. Truck/trailers <br /> e. Generators <br /> Additional Information (as applicable to project) <br /> Truck Route: Describe truck routes (attach route map), include number of trucks and <br /> staging location. <br /> 6 <br />