Laserfiche WebLink
The number of trucks will Vary greatly over the course,of the project: ~ During concrete <br /> operations ,'-we expect-a minimum of.fifty (50) deliveries in`.the.course:of a typical day: .• • <br /> The proposed truck route for the project will be as shown--on the attached Traffic <br /> - Pattern to €rater/E:if aobsite. Most trucks, except. for the`foundation mat- concrete, <br /> trucks, will be staged on-site and_n i <br /> riot on.CollnsAvenue: The contractor-will design <br /> project :trucks routeswithin.the property to allow for truck staging'within the site <br /> In addition, .the .contractor will-have-trained and certified flagmen (''gate attendants'') at <br /> each gate that,will ensure no trucks stage: on Collins Avenue and will allow_ `trucks to exit <br /> the site with m,iriimizing disruption.to tra ffic. <br /> As at.Jade Signature, our .contractor will hold training sessions with all subcontractors, <br /> and vendors. to review the truck 'route and rules and regulations regarding truck• <br /> deliveries. For example, at Jade Signature, the contractor has inserted language into all <br /> subcontracts and purchase orders requiiingihem`to: <br /> _ :1 . .Fully comply with plans:like this one, at all times _ <br /> 2. No delivery vehicles are allowed..to make 'u-turns"-on Collins Avenue <br /> 3. No delivery vehicles are allowed to-utilize side streets-or" commercial parking lots <br /> to-make r.''tu rn-arounds" <br /> 4. No delivery vehicles are allowed to block Collins Avenue for any reason <br /> Materal-Storage'location: Describe fhelocation for material storage(_i f needed). Any <br /> removal or°relocation df sand, must be-appro,vedseparately: <br /> It is our intention that some materials Wilt be stored on-site, space permitting. Locations <br /> will vary throughoUt-the:course of the activities 'however,-the materials will remain inside <br /> the fenced construction site.- <br /> Specifically for sand, we would ideally:like -to:stock the Sand on-site, sift:(if required by <br /> FDEP) on-Site, and-glace-on the be_ach difeetly:frrom bur "site. If this cannot occur due°to <br /> FD.EP and City requirements, like at Jade Signature, we will rent land in west Miami- <br /> Dade County, haul the excavated sand for storage at this land, sift the sand there, and <br /> wait for further instructions on'san`d placementfrom-theCity.and FDEP: <br /> Construction Trailer: Will a construction trailer be used? If so, show location? <br /> Construction trailers (for both managers,and materialsJequipment)will be required on- <br /> site. Please see the proposed locations on-site, below: <br /> 7 <br />