My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2473
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2473
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 2:20:34 PM
Creation date
12/3/2015 2:20:33 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2473
Date (mm/dd/yyyy)
10/15/2015
Description
Change Orders 2 & 3 Fla. Engineering & Dev. Corp. 174th St. Roadway Imp
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Florida Engineering&Development Corp <br /> 12076 NW 98th Ave. <br /> Hialeah Gardens Fl.33018 FLORIDA ENGINEERING_ <br /> &DEVELOPMENT CORP. <br /> Project:NE 174th Street Roadway Improvements «��s <br /> Scope of work:New 6"DIP Crossing at NE 174 Street.(each) <br /> Exclusions:This proposal do not include any removal of Asbestos Pipes. <br /> Location: NE 174th Street <br /> Date:9/15/2015 <br /> Note: This job will be done at night and need to shut down the travel lanes. <br /> PROPOSED CHANGE ORDER No. 3 New 6"Water Services DIP(each) <br /> A) 6"Water Services DIP <br /> I No. I Item I Qty I Unit j Unit Price I Total I <br /> Laborer <br /> 1 Foreman 16 Hrs S 54.34 $ 869.44 <br /> 2 Operator Mini Excavator 16 Hrs S 42.26 $ 676.16 <br /> 3 Operator Loader 16 Hrs $ 42.26 $ 676.16 <br /> 4 Pipelayer 16 Hrs $ 33.81 $ 540.96 <br /> 5 Laborer 16 Hrs $ 28.98 $ 463.68 <br /> Subtotal Labor $ 3,226.40 <br /> Equipment <br /> 6 Mini Excavator 16 Hrs S 40.00 $ 640.00 <br /> 7 Loader 16 Hrs $ 85.00 $ 1,360.00 <br /> 8 Plate Compactor • 16 Hrs S 25.00 $ 400.00 <br /> Subtotal Equipment $ 2,400.00 <br /> Material <br /> 9 12X6 Tapping Sleeve 1 Ea $ 2,725.55 $ 2,725.55 <br /> 10 6 CL 350 CI DI PIPE 80 Lf S 33.78 $ 2,702.40 <br /> 11 6 MJ C153 45 Bend 4 Ea $ 97.02 $ 388.08 <br /> 12 6 DI WDG REST ONELOK W/A 8 Ea $ 64.33 $ 514.64 <br /> 13 6 Cap 1 Ea $ 97.53 $ 97.53 <br /> 14 Poliwrap 1 Ea 5 350.00 S 350.00 <br /> 15 Road Plate 2 Ea S 107.00 $ 214.00 <br /> 16 Trench Restoration Street&Sidewalk(Asphalt Temporary) 25 Sy $ 21.60 $ 540.00 <br /> 17 Dewatering Sistem 2 Day S 620.00 $ 1,240.00 <br /> Subtotal Material $ 8,772.20 <br /> Subcontractor <br /> 18 Mot 1 Ls $ 925.11 $ 925.11 • <br /> 19 Police Officer 16 Hrs $ 60.00 $ 960.00 <br /> 20 Tapping into the existing line 1 Ea. $ 735.50 $ 735.50 <br /> 21 Flushing&Chlorination 1 Ls $ 467.16 $ 467.16 <br /> 22 Bacteriological Test 1 Ea. $ 154.00 $ 154.00 <br /> 23 Overtime North Miami Beach Inspector Plus$50 Adm fee 16 Hrs $ 80.00 $ 1,280.00 <br /> 24 Extended Hours Fee of Sunny Isles 16 Hrs $ 48.00 $ 768.00 <br /> Subtotal Subcontractor $ 5,289.77 <br /> Sub-total PCO#3 $ 19,688.37 <br /> 15%Overhead,Profit S 2,953.26 <br /> Oh , ///0- Sub-total PCO#3 S 22,641.63■ <br /> Omar Medina <br /> Florida Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.