My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2473
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2473
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 2:20:34 PM
Creation date
12/3/2015 2:20:33 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2473
Date (mm/dd/yyyy)
10/15/2015
Description
Change Orders 2 & 3 Fla. Engineering & Dev. Corp. 174th St. Roadway Imp
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/9/2015 Item Coversheet <br /> " Y' City of Sunny Isles Beach <br /> ok '%7, 18070 Collins Avenue <br /> t V — :. Sunny Isles Beach,Florida 33160 <br /> S:., sloa;1:01s (305)947-0606 City Hall <br /> °,r,..0: °s.,µ,?° (305)949-3113 Fax <br /> MEMORANDUM <br /> TO: The Honorable Mayor and City Commission <br /> VIA: Christopher J. Russo, City Manager <br /> FROM: Elka Linton-Dorsett, Capital Projects Manager <br /> DATE: 10/15/2015 <br /> Approving Change Order No. 2 with Florida Engineering <br /> and Development Corp.for Professional Construction <br /> RE: Services for the 174th Street Roadway Improvement <br /> Project and Change Order No. 3 to Remove and <br /> Replace up to Seven (7) Existing Water Service Lines <br /> RECOMMENDATION: <br /> Staff recommends approval of this resolution. <br /> REASONS: <br /> Resolution No. 2015-2401 approved the award of ITB No. 14-11-01 to <br /> Florida Engineering and Development Corporation to provide <br /> professional construction services for the construction of the 174th <br /> Street Roadway Improvement project. The general scope of services <br /> included drainage enhancements, complete sidewalk and roadway <br /> reconstruction from North Bay Road east, to Collins. Improvements <br /> west of North Bay Road were limited to milling and resurfacing the <br /> existing pavement surface, and minimal sidewalk repair. New <br /> landscaping and irrigation will be installed along the full length of 174th <br /> street. <br /> The $2,965,750.20 contract award included a project contingency <br /> amount of$268,418.14. <br /> In September 2015, Change Order No. 1 was executed to apply <br /> $74,039.05 of the project contingency towards the installation of IT <br /> conduit within the project limits for future use by the City. <br /> Changer Order No. 2 will increase the project scope and fee to include <br /> demolition and replacement of all the existing curb and sidewalk west <br /> of North Bay Road, thereby enhancing the aesthetics and ADA <br /> compliance of this existing sidewalk. The total amount for Change <br /> Order No. 2 is in an amount not to exceed $208,537.14 for a total <br /> contract value of$3,174,287.34. <br /> Furthermore, during the on-going construction activities, it was <br /> determined that some of the existing North Miami Beach owned water <br /> service lines connected to the Winston Towers residences are in poor <br /> condition. In partnership with the City of North Miami Beach, existing <br /> services lines within the 174th street corridor will be repaired, as <br /> deemed necessary by the City North Miami Beach. Changer Order <br /> No. 3 includes those additional services necessary for Florida <br /> Engineering and Development Corporation to remove and replace up <br /> to seven (7) existing water service lines. The amount for each water <br /> service line is $22,641.63. Therefore, the total amount for Changer <br /> http://sunnyi sles.novusagenda.com/agendaweb/CoverSheet.aspx?Item ID=1758 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.