My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB No. 15-12-02 Utility Undergrounding
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
ITB No. 15-12-02 Utility Undergrounding
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 9:59:07 AM
Creation date
12/9/2015 9:58:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach |ITB No. 15-12-02 17 <br /> <br /> Streets temporarily restored, as described above, must be regularly maintained. For <br />example, streets must be watered, new potholes filled and disturbed and adjacent paved <br />streets swept. <br /> <br />F. The Contractor shall employ and pay for the services of an independent testing laboratory to <br />perform quality control services on work performed by the contractor. <br /> <br />G. There is an available Geotechnical Investigation Report at the City of Sunny Isle Beach. <br /> <br /> The above referenced report is no guarantee as to accuracy of completeness. <br /> The Contractor is cautioned that this report has been utilized for general p urposes only <br />and may be inadequate for the purposes of bidding on the Contract items. <br /> The availability of this report does not relieve the Contractor from his responsibility to <br />familiarize itself with the subsurface conditions that may affect cost, progress and <br />performance of work. <br /> <br />3.3 WORK PERFORMED BY OTHERS <br /> <br />The City of Sunny Isles Beach or other contractors may perform work on the existing water <br />distribution system or public utilities as part of their maintenance and operations. The Contractor <br />shall conduct its operations so as to cause a minimum of interference with the work of such other <br />contractors and/or public utilities, and shall cooperate fully to provide continuous safe access to <br />their respective portions of the site to perform their respective contracts. <br /> <br />3.4 CONTRACTOR'S USE OF PREMISES <br /> <br />See General Conditions. <br />3.5 WORK SEQUENCE, COORDINATION ACTIVITIES AND SCHEDULED DATES: <br /> <br />A. General: Work under this contract shall be scheduled and performed in such a manner as <br />to result in the least possible disruption to driveway access. The CONTRACTOR will coordinate its <br />work with other adjacent contractors, landowners, residents and City activities, with specific <br />attention to access and staging areas. Construction sequence shall be determined by <br />CONTRACTOR subject to the following needs for continuous access and operation by others. <br />1. The work will be performed in residential/commercial neighborhoods. The CONTRACTOR <br />shall reasonable minimize the inconvenience to the residents and property owners, and <br />reasonably maximize the safety of the residents: <br />2. Construction activities shall take place between the hours of 8:00 PM to 7:00 AM. <br />Deliveries shall be allowed between the hours of 8:00 PM to 7:00 AM. <br />3. All open trenches and excavations shall be closed or covered, and be in good driving <br />condition with temporary pavement, at the end of each work day.
The URL can be used to link to this page
Your browser does not support the video tag.