Laserfiche WebLink
<br />City of Sunny Isles Beach |ITB No. 15-12-02 18 <br /> <br />4. CONTRACTOR cannot proceed with the construction in more than one street at the same <br />time, unless approved otherwise. <br />5. The work shall be conducted to maintain access to existing driveways at all times. <br />B. Construction Schedule: The CONTRACTOR shall submit a proposed construction <br />schedule, clearly showing the sequence of the work on a street-by-street and block by block <br />basis to the City and the ENGINEER for their approval. Refer to Section 01310 Construction <br />Schedules. <br /> <br /> <br /> <br />THIS SECTION INTENTIONALLY LEFT BLANK <br />END OF SECTION <br /> <br />