My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2495
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2495
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2015 3:31:31 PM
Creation date
12/10/2015 3:31:28 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2495
Date (mm/dd/yyyy)
11/19/2015
Description
4th Amd to Agmt w/Calvin Giordano re: Pedestrian & Emergncy Bridge Srv
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Authorization No. 177 <br /> October 29,2015 <br /> Calvin,Giordano&Associates,Inc.Proposal No. 15-7567.1 <br /> CITY OF SUNNY ISLES BEACH <br /> North Bay Road Bridge Re-design for Easement Concerns <br /> PROJECT DESCRIPTION <br /> 1. SCOPE OF SERVICES <br /> Calvin, Giordano & Associates, Inc. will perform the following services based on <br /> our understanding of the project requirements: <br /> I. Professional Engineering Services <br /> A. Civil Engineering <br /> 1. South Bridge Approach: <br /> • Civil Engineering modifications to the South Bridge approach due <br /> to: FPL transformer location, Porto Bellagio ingress/egress, <br /> hardscape, fencing, lighting, drainage, irrigation and landscaping <br /> are excluded from this proposal <br /> 2. North Bridge Approach: <br /> • Incorporate shifted sidewalk along the east MSE wall with revised <br /> drainage. Widen east pathway as permissible. <br /> • Incorporate or modify drainage & civil design changes as required <br /> as a result of the 174th St. project. <br /> 3. It is assumed that no permitting modifications or services will be <br /> required as a result of these changes. Any additional permitting effort <br /> shall require an Additional Services Agreement. <br /> • <br /> B. Electrical Engineering <br /> 1. Meet with City and consultants to discuss revised plans. Determine <br /> extent of structural modifications which will impact electrical lighting, <br /> conduits, cabinets, etc. Revise electrical plans to coordinate with <br /> structural modifications both at bent 1-2 and south approach. <br />
The URL can be used to link to this page
Your browser does not support the video tag.