My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2495
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2495
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2015 3:31:31 PM
Creation date
12/10/2015 3:31:28 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2495
Date (mm/dd/yyyy)
11/19/2015
Description
4th Amd to Agmt w/Calvin Giordano re: Pedestrian & Emergncy Bridge Srv
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Authorization No. 177 <br /> October 29,2015 <br /> Calvin,Giordano&Associates,Inc.Proposal No. 15-7567.1 <br /> C. Traffic Engineering <br /> 1. Design Modification <br /> • Considering the purpose of the structural design modification at <br /> Bent#1, CGA Traffic Engineers will review and evaluate all <br /> available survey data to help minimize and mitigate any potential <br /> impacts of the proposed pedestrian bridge on adjacent properties. <br /> • As part of the design modification process, an extensive Quality <br /> Assurance/Quality Control review will be completed to ensure <br /> that all the potential impacts of the proposed bridge are mitigated <br /> and addressed <br /> • Traffic Engineering modifications to the South Bridge Approach <br /> due to: FPL transformer location, Porto Bellagio ingress/egress, <br /> hardscape, fencing, lighting, drainage, irrigation and landscaping <br /> are excluded from this proposal. <br /> D. Structural Engineering(Sub-Consultant) <br /> 1. South Bridge Approach <br /> • Structural Engineering modifications to the South Bridge <br /> Approach(South end bent; Bent#1). <br /> II. Professional Government Consulting Services <br /> A. Participate in various meetings with City staff and other consultants to <br /> discuss Bent#1 structural re-design per the City requests. <br /> C. Manage and QC the completion of the traffic re-design due to structural <br /> revisions at Bent#1 per the City directions. <br /> D. Manage the completion of the structural re-design at Bent#1 to be <br /> completed by the Structural FOR per the City directions. <br /> E. Manage the notifications only to the permitting AHJ of the minor re-design. <br /> Although it is not anticipated at this time, any permit modifications required <br /> will need to be addressed in additional work authorizations. Permit <br /> C J <br />
The URL can be used to link to this page
Your browser does not support the video tag.