Laserfiche WebLink
• <br /> SUNNY I, z <br /> `+ F • <br /> 9 <br /> O n <br /> gai•i� • <br /> • <br /> */ <br /> 'r2 <br /> si it P <br /> Se 91• FLO0.\ 5F. <br /> C/rY OF SUN �O <br /> Addendum No. 3 <br /> CITY OF SUNNY ISLES BEACH <br /> Collins Avenue Utility Undergrounding <br /> CITY BID NO. 15-12-03 <br /> To All Bidders: <br /> Bidders for the above-referenced project shall take note of the following changes, additions, deletions, <br /> clarifications, etc. to the Plans and Specifications, which in accordance with the Contract Documents <br /> shall become a part of and have precedence over anything shown or described otherwise. <br /> A pre-bid meeting for this project was held on December 9'", 2015. The meeting minutes and <br /> attendance list have been uploaded to Demandstar separately. The following are formal <br /> responses to questions asked at the Pre-bid meeting: <br /> • In the Plans that have been uploaded, there are some pavement markings and lighting <br /> .plans. In the bid items there is nothing about that scope of Work. Is that just a reference? <br /> £id<;...s ;cYes; the)FDOT plans that are included in the plan set are for reference. The lighting plans <br /> ciarikaioare included••to'=provide design support for the light pole bases, empty electrical conduit and <br /> :opull-boxes•.which-are to be installed under this contract. Pavement marking plans are <br /> provided for reference when restoring the existing pavement markings only. <br /> • The MOT Plans that were provided, there were certain sections that were being installed <br /> behind the concrete barrier wall, is that correct?. <br /> Please refer to FDOT index No. 600, sheet 9 of 12, Drop-Off Condition Note #8 which <br /> states "For conditions 1 and 3 provided in Table 1, any drop-off condition that is created and <br /> restored within the same work period will not be subject to the use of barriers; however, <br /> warning devices will be required." <br /> ciar c!i;nSoilslreport? <br /> ^rnc <br /> A-soils report is not available. Please refer to the InfraMap Test Hole Inventory and Report <br /> dated December 1s', 2014 (included in Addendum No. 4) for basic soil conditions and water <br /> levels. - , <br /> *![- <br /> Monday, <br /> [Monday, December 28, 2015 <br />